My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIESTA MARKETPLACE PARTNERS (4)
Clerk
>
Contracts / Agreements
>
F
>
FIESTA MARKETPLACE PARTNERS (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2024 5:47:49 PM
Creation date
8/26/2024 2:50:09 PM
Metadata
Fields
Template:
Contracts
Company Name
FIESTA MARKETPLACE PARTNERS
Contract #
A-1987-008
Agency
Community Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10. Construct a 25 feet radius curb return at the <br />northeast corner of Bush and Third Streets with <br />a wheel chair access depression, spandrel and <br />joining the•existing x-gutter southerly. <br />11. Construct a sidewalk landing using Theme design <br />with a wheelchair ramp and a property line <br />radius of 17 feet. <br />12. Construct paving adjacent to all new curb, gut- <br />ter, spandrel and x-gutter as required. <br />B. Third Street <br />1. Remove all curb, gutter, drive approaches, <br />street lights and curb return at French Street <br />except the sidewalk and curb and gutter spanning <br />Spurgeon Street at the Paseo De Spurgeon plaza. <br />Note: The street lights in this case are to be <br />retained and reinstalled they should not be <br />damaged on removal. <br />2. Construct Theme curb and gutter at 20 feet from <br />street centerline as per Bush Street A(2) <br />above from Bush Street to French Street except <br />at Spurgeon Street where not removed. <br />3. Construct standard portland cement concrete <br />sidewalk 10 feet wide from'curb face to property <br />line with 3 feet by 3 feet street tree wells <br />adjacent to the curb per City standard plan <br />number 104. <br />4. Plant street trees per City Standard plan number <br />124. <br />5. Construct new street light-c6nduit and rein- <br />stall street lights that were removed and as <br />required. <br />Note: locations and numbers may be changed. <br />6. Construct only two drive approaches at existing <br />building accesses between Spurgeon Street plaza <br />and French Street. The drive approaches will be <br />only 6 feet from curb face to sidewalk surface. <br />The K's shall be width of garage openings, the <br />A's at the curb are to be 14 feet wider than the <br />established W's including the x-sections. <br />Note: No drive approaches 'are to be.shown on <br />the plans for Third Street between Bush Street <br />and Spurgeon Street. However, a note shall be <br />added that the•Public Services Agency engineer- <br />ing staff is to be contacted prior to -the con- <br />struction of curb, gutter and sidewalk regarding <br />ki;drive approach(es) in this area: <br />7. 'Co nstruct .a new 15 feet .'radius curb' return at <br />the northwest corner of Ereach Street With. a <br />wheelchair ramp. <br />
The URL can be used to link to this page
Your browser does not support the video tag.