Laserfiche WebLink
87-101716 <br />8. Construct paving adjacent to the.new curb and <br />gutter as required. <br />•C. French Street - between Third and Fourth Streets <br />i. Remove all existing curb, sidewalk street lights <br />and drive approaches. <br />2. Construct modified A-2-8 Theme sidewalk at 20 <br />feet from street centerline. <br />3. Construct full width Theme sidewalk curb to <br />property line. <br />4. Construct circular Theme street tree wells with <br />ornamental grates, adjacent to the curb. <br />5. Plant street trees per Bush Street item A(5). <br />6. Construct two drive approaches curb face to <br />property line per standard 112C the A•s are to <br />be 14 feet wider than the entrances including <br />the x-sections. <br />Note: One is at the alley and the other is at <br />the automotive restoring business. <br />7. Construct ornamental Theme -street lighting with <br />underground power. <br />8. Construct street paving adjacent to new curb and <br />gutter as required. <br />D. Public alley from French Street to Bush Street <br />immediately north of Third Street. <br />1. Remove all existing alley paving. <br />2. Constuct 8 inch thick portland'.cement concrete <br />pavement 10 feet each side of alley centerline <br />except where buildings are to remain from French <br />Street to gush Street joining the Paseo De <br />Spurgeon on each side. The alley is to be <br />graded per City alley standard III and as <br />directed. <br />E. Public Alley from the E1 Mercado west of Prench <br />Street to Spurgeon Street, north of Fourth Street. <br />1. Remove all existing paving. <br />2. Construct 8 inch thick Portland cement concrete <br />pavement 10 feet each aide of alley centerline. <br />F. Spurgeon Street. <br />1, geaovd all existing paving, currb, -,Sutter slde—. <br />walk and street -lights. Deliver the street <br />fights to the City Yard at 730 E.' Warner Ave. in <br />