My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MARIPOSA LANDSCAPES, INC. (4)
Clerk
>
Contracts / Agreements
>
M
>
MARIPOSA LANDSCAPES, INC. (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2024 11:14:24 AM
Creation date
9/6/2024 11:11:36 AM
Metadata
Fields
Template:
Contracts
Company Name
MARIPOSA LANDSCAPES, INC.
Contract #
A-2024-132
Agency
Public Works
Council Approval Date
8/20/2024
Expiration Date
12/31/2027
Insurance Exp Date
6/15/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Implementation and Startup Plan <br />Project Startup and Quality Control Coordination Meeting <br />The Project Estimator and the Account Manager review the project specifications and visit the project site(s) to <br />develop a work plan for the completion of the project per specifications. A meeting including the Account Manager <br />with key personnel responsible for carrying out the work, is held to discuss and coordinate how the project work will <br />be performed. <br />Documentation <br />Prior to commencement of contract work we will thoroughly inspect and document deficiencies. After this is <br />completed for each location, we will provide a detailed list. We will also include a proposal for restoring the area to <br />its original condition if applicable. During the meeting, the Account Manger communicates the work task quality <br />requirements and reinforces heightened awareness for critical requirements. <br />Topics for the meeting include: <br />• Project requirements per specifications. <br />• Record keeping documents and availability of necessary forms. <br />• Review methods, sequence of work tasks and timeline. <br />Preparatory Site Inspection <br />The Account Manager performs a quality inspection of the work area and: <br />• Assesses the required work to be done per specifications. <br />• Verifies field measurements. <br />• Assures availability of required equipment and materials to complete the project. <br />• Identifies potential problems and develops an action plan to resolve them. <br />Scheduling <br />Mariposa Landscapes, Inc. will submit a detailed schedule that includes all the routine activities. After submission <br />and approval of this schedule, we will be ready to start work. <br />Labor <br />Our proposal is calculated to provide full-time employees to the project on a year-round basis. It is our goal to <br />provide professional results. Therefore, we will assign the appropriate and trained crew force necessary to complete <br />the specified activities in a professional and timely manner. To achieve the desired results, the appropriate labor <br />will be assigned for every aspect of the work. <br />Contract Executed or an Official Notice to Proceed <br />On new contracts we typically purchase trucks and equipment, so we cannot initiate purchases until we have a <br />signed commitment. Quicker startups that are 30 days or less may be an issue with supply chain delays. We prefer a <br />60 to 90 day start for our procurement. During this period, before the Job Start, we may have one or more meetings <br />with the client to meet the management staff and go over a preliminary schedule of work. We also use this interim <br /><S9 Our Core Values — Safety • Teamwork • Quality • Integrity Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.