Laserfiche WebLink
TABLE 3 <br />CONVEYANCE AND DISTRIBUTION SYSTEM BENEFITS <br />ription <br />S VALLEY PIPELINE - NORTH REAC H <br />PERRIS VALLEY PIPELINE - RESERVED FOR STAG E II DESIGN ! BUI LID <br />PERRIS VALLEY PIPELINE- SOUTH REACH <br />PERRIS VALLEY PIPELINE- STUDY <br />PERRIS VALLEY PIPELINE- TIE-IN (WMWO) <br />PERRIS VALLEY PIPELINE - VALVES <br />PERRIS VALLEY PIPELINE DESIGN -BUILD (EMWD) <br />PERRIS VALLEY PIPELINE NORTH REACH <br />PERRIS VALLEY PIPELINE SOUTH REAC H <br />PERRIS VALLEY PIPELI NE TIE-IN (WMWD) <br />PERRIS VALLEY PIPELINE VALVES <br />PLACENTIA RAILROAD LOWERING PROJECT <br />PLACERITA CREEK PERI METER FENCI NG <br />PLANT INFLUENT REDU NDANT FLOW METERING AND SPLITTING <br />PRESTRESSED CO NCRETE CYLINDER PIPE . PHASE 2 <br />PRESTRESSED CO NCRETE CYLINDER PIPE -PHASE 3 <br />PUDDINGSTONE SPILLWAY CROSS CONNECTION <br />RED MOUNTAIN HEP FLOOD DAMAGE <br />RED MTN COMM. TOWER & METER STRUCTURE <br />RELOCATION OF ORANGE COUNTY Ff~FDER <br />RELOCATION OF PORTION OF ORANGE COUNTY FEEDER (MWD'S SHARE) <br />REMAINING PORTIONS <br />REPAIRS TO THE LA-35 DISCHARGE STRUCTURE <br />REPLACE 2 FIRE & DOMESTIC WATER SYSTEM <br />REPLACE COM MUNICATION LINE TO THE SAN GABRIEL CONTROL. TOWER <br />REPLACE COPPER GROUNDWIRES ON DESERT HI GH VOLTAGE TRANSMISSION TOWERS <br />REPLACE VALVE POSITION INDICATORS <br />RIALTO FEEDER BROKEN BACK REPAIR <br />RIALTO FEEDER VALVE STRUCTURE <br />TO FEEDER, REPAI RS AT SELECT LOCATIONS, STUDY <br />TO PIPELINE -CONSTRUCTION PHASE 1 <br />RIALTO PIPELINE -CONSTRUCTION PHASE 2 <br />RIALTO PIPELINE IMPROVEMENTS <br />RIALTO PIPELINE IMPROVEMENTS -CONSTRUCTION <br />RIALTO PIPELINE IMPROVEMENTS -CONSTRUCTION PHASE IN <br />RIALTO PIPELINE IMPROVEMENTS - DESIGN PHASE 2 <br />RIALTO PIPELINE IMPROVEMENTS - DESIGN PHASE 3 <br />RIALTO PIPELINE IMPROVEMENTS - FINAL DESIGN <br />RIALTO PIPELINE IMPROVEMENTS -VALVE PROCUREMENT <br />RIALTO PIPELINE IMPROVEMENTS PHASE 1 FINAL DESIGN <br />RIALTO PIPELINE REPAIRS AT STATION 3198+44 <br />ROBERT B. DIEMER FILTRATION PLANT- LAND ACQUISITION <br />ROOF REPLACEMENT AT SOTO ST. FACi LITY <br />DIEGO CANAL- EAST & WEST BYPASS SCREENING STRUCTURES STUDY <br />DIEGO CANAL- ELECTRICAL VAULT & CONDUCTOR REPLACEMENT <br />DIEGO CANAL- FENCING <br />DIEGO CANAL- INSTALL ACOUSTIC FLOW METER <br />DI EGO CANAL- PIEZOMETER <br />DIEGO CANAL - REPLACE SODIUM BISULFATE TANK <br />DIEGO CANAL - SEEPAGE STUDY <br />30 <br />