My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
METROPOLITAN WATER DISTRICT OF SOUTHERN CALIFORNIA (4)
Clerk
>
Contracts / Agreements
>
M
>
METROPOLITAN WATER DISTRICT OF SOUTHERN CALIFORNIA (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2025 4:49:46 PM
Creation date
9/16/2024 10:52:01 AM
Metadata
Fields
Template:
Contracts
Company Name
METROPOLITAN WATER DISTRICT OF SOUTHERN CALIFORNIA
Contract #
A-1965-001
Agency
Public Works
Destruction Year
1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 3 <br />CONVEYANCE AND DISTRIBUTION SYSTEM BENEFITS <br />ription <br />Distribution Facilities (continued)_ <br />SAN DIMAS HEP BATTERY BANK AND GENERATOR BREAKER <br />SAN DIMAS PCS - UNINTERRUPTIBLE POWER SOURCE SYSTEMS INSTALLATION <br />SAN FRANCI SQUITO PIPELINE BLOW OFF STRUCTURE, STA 287+70, ACCESS ROAD CONSTRUCTION <br />SAN GABRIEL TOWER SLI DE GATE REHABI LITATION <br />SAN JACINTO #1 AND #2 CASA LOMA FAULT CROSSING STRUCTURE UPGRADE <br />SAN JOAQUIN RELIEF STRUCTURE FOR EASTERN O RANGE COUNTY FEEDER #2 <br />SAN JOAQUIN RELIEF STRUCTURE FOR EASTR OC FDR #2 <br />SAN JOAQUIN RESERVOIR, INSTALLBULKHEAD <br />SANTA ANA RIVER BRIDGE SEISMIC RETROFIT <br />SANTA MONICA FEEDER RELOCATI ON <br />SANTA MONICA FEEDER STAT ION 495+10 REHABILITATION <br />SANTIAGO LATERAL REPLACE MOTO R - OPERATED VALVE <br />SANTIAGO LATERAL STA 216+40 BUTTERFLY VALVE REPLACEM ENT <br />SANTIAGO TOWER ACCESS ROAD IMPROVEMENT <br />SCADA SYSTEM HARDWARE UPGRADE <br />SCADA SYSTEM NT SOFTWARE UPGRADE <br />SCADA SYSTEM SUPPORT PROGRAMS <br />SDAND CASA LOMA CANALS LINING <br />SD CANAL EAST & W EST BYPASS SCREEN ING STRUCTURES STUDY <br />SD CANAL REPLACE SODI UM BISULFITE TANK <br />SD PIPELINE 3 CULVERT ROAD REHAB <br />SD PIPELINE 3,4, AND 5 PROTECTIVE COVER <br />SD PIPELINE EXPLORATORY EXCAVATION <br />SD PIPELINE 5 EXPLORATOTY EXCAVATION <br />SD PIPELINES 3 AND 5 REMOTE CONTROL BY PASS STRUCTURE G ATES AND ISOLATION VALVES <br />SECOND LOWER & SEPULVEDA FEEDERS SCI DRAIN STATIONS <br />SECOND LOWER CROSS FEEDER - VALVE PROCUR EMENT <br />SECOND LOWER CROSS FEEDER CO NSTRUCTION <br />SECOND LOWER CROSS FFEDFR FI NAL DESIGN <br />SECOND LOWER FEEDER- INSTALL LINER <br />SECOND LOWER FEEDER CURRENT MITIGATION REFURBISHMENT <br />ND LOWER FEEDER PCCP REPAI RS <br />PRESSURE REPLACE VALVE PCSI TION INDICATORS <br />PULVEDA FEEDER CO RROSIONIINTERFEREN CE MITIGATION, STATION 950+00 TO 1170+00 <br />PULVEDA FEEDER REPAI RS AT 3 SITES <br />PULVEDA FEEDER STATI ON 2002+02 TO 2273+28 STRAY CURRENT INTERFERENCE M ITIGATION <br />PULVEDA FEEDER STRAY CURRENT MITIGATION REFURBISHMENT <br />PULVEDA PCS - PERI METER ASPHALT REPAI RS <br />RVICE CONNECTION LV-01 UPGRADES <br />MULATION AND MODELI NG APPLICATION FOR REAL Tl ME OPERATIONS SMART OPS <br />(INNER BRANCH -AIR INJECTION MODIFICATIONS TO RED MOUNTAIN POWER PLANT <br />(INNER BRAN CH - CASA LOMA CANAL <br />SKINNER BRANCH - CASA LOMA SIPHON BARREL ONE <br />SKINNER BRANCH - CATWALK FOR TRAVELI NG MAINTENANCE BRI DGE FOR <br />SKINNER BRAN CH - FABRICATE & REPLACE THE STEMS, NUTS & KEY S <br />SKINNER BRAN CH - REPAIR MODULE 1 AND 2 FLOCC ULATCRS BRI DGES <br />SKINNER DISTRIBUTION SYSTEM - CONTRACT # 1396 <br />SKINNER FILTRATION PLANT- CHLORINE MASS FLOW METERS <br />SKINNER FILTRATION PLANT- EFFLUENT WATER QUALITY BLDG <br />SKINNER FILTRATION PLANT -ELEVATED SLAB IN SERVICE BLDG 1 <br />32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.