Laserfiche WebLink
SECTION V <br />ta <br />www.FinanceDTA.com <br />LAND IMPROVEMENT DIRECT <br />COSTS <br />C Erosion and Dust Control <br />We estimated that erosion and dust control would cost about $90,000 per acre. <br />Table 28: Erosion and Dust Control Costs <br />. .. <br />Apartment <br />$926,100 <br />$521,100 <br />$806,400 <br />$2,253,600 <br />Commercial <br />$174,600 <br />$0 <br />$0 <br />$174,600 <br />Hotel <br />$117,900 <br />$0 <br />$0 <br />$117,900 <br />Congregate <br />$62,100 <br />$0 <br />$0 <br />$62,100 <br />Amenity <br />$495,900 <br />$54,000 <br />$538,200 <br />$1,088,100 <br />Total Erosion and Dust Control <br />1 $1,776,600 <br />1 $575,100 <br />$1,344,600 <br />1 $3,696,300 <br />D Storm Drain Systems <br />The estimate for storm drain improvements includes replacing most of the existing storm drain <br />since the current locations are not in accordance with the proposed Project. DTA also added <br />costs for 54-inch, 60-inch, and 78-inch Reinforced Concrete Pipe ("RCP") as described in the <br />Specific Plan. Finally, we added a Local Impact Development ("LID") allowance in accordance <br />with City requirements and traffic control while the improvements are installed. <br />Table 29: Storm Drain Estimate <br />Apartment <br />$2,421,980 <br />$819,815 <br />$614,818 <br />$3,856,613 <br />Commercial <br />$7,500 <br />$0 <br />$0 <br />$7,500 <br />Hotel <br />$7,500 <br />$0 <br />$0 <br />$7,500 <br />Congregate <br />$7,500 <br />$0 <br />$0 <br />$7,500 <br />Amenity <br />$30,000 <br />$7,500 <br />$30,000 <br />$67,500 <br />Backbone <br />$1,870,000 <br />$0 <br />$0 <br />$1,870,000 <br />Total Storm Drain System <br />$4,344,480 <br />$827,315 1 <br />$644,818 <br />$5,816,613 <br />E Sanitary Sewer Systems <br />The estimate for sanitary system improvements is based upon removing and replacing all the <br />in -tract sewer lines since DTA determined that the Project will be relocating all the easements <br />where the sewer lines are currently located. The Specific Plan states that a new 78-inch vitrified <br />clay pipe would be required to connect to existing infrastructure. We also budgeted traffic <br />control during construction. <br />Related Bristol at 3600 South Bristol Street <br />Land Residual Value Study Report <br />Exhibit 10 <br />September 27, 2023 <br />/ 24 <br />