Laserfiche WebLink
SECTION V <br />LAND IMPROVEMENT DIRECT <br />t(I COSTS <br />www.FinanceDTA.com <br />Table 30: Sanitary Sewer Estimate <br />Apartment <br />$2,306,550 <br />I $784,470 <br />$598,790 <br />$3,689,810 <br />Commercial <br />$10,875 <br />$0 <br />$0 <br />$10,875 <br />Hotel <br />$10,875 <br />$0 <br />$0 <br />$10,875 <br />Congregate <br />$10,875 <br />$0 <br />$0 <br />$10,875 <br />Amenity <br />$43,500 <br />$10,875 <br />$43,500 <br />$97,875 <br />Backbone <br />$500,000 <br />$0 <br />$0 <br />$500,000 <br />Total Sanitary Sewer System <br />$2,882,675 <br />1 $795,345 <br />$642,290 <br />$4,320,310 <br />F Potable and Reclaimed Water <br />As with sanitary sewer systems, DTA estimated the costs of removing and replacing all the <br />in -tract potable water lines since we determined the Project will be moving all the <br />easements where the sewer lines are currently located. We budgeted traffic control during <br />construction. We also estimated that the City would require the Developer to install <br />non -potable water lines throughout the Project site in accordance with current City <br />requirements. <br />Table 31: Potable Water Costs <br />Potable <br />Apartment <br />$2,412,300 <br />$837,345 <br />$559,290 <br />$3,808,935 <br />Commercial <br />$28,500 <br />$0 <br />$0 <br />$28,500 <br />Hotel <br />$28,500 <br />$0 <br />$0 <br />$28,500 <br />Congregate <br />$28,500 <br />$0 <br />$0 <br />$28,500 <br />Amenity <br />$114,000 <br />$28,500 <br />$114,000 <br />$256,500 <br />Backbone <br />$312,500 <br />$0 <br />$0 <br />$312,500 <br />Total Potable Water <br />$2,924,300 <br />$865,845 <br />$673,290 <br />$4,463,435 <br />Table 32: Non -Potable Water Costs <br />Non -Potable <br />Apartment <br />$1,130,100 $379,095 <br />$274,503 $1,783,698 <br />Total Non -Potable Water <br />$1,130,100 $379,095 <br />$274,503 $1,783,698 <br />G Street Improvements <br />The estimate for street improvements includes asphalt, concrete, and streetlights. Since the <br />Specific Plan is not specific on the street profiles, DTA reviewed City standard plans and <br />made estimates for the street widths. We estimate an average streetlight with a cost of <br />$6,000 per fixture, totaling about $1.0 million upon the build -out of the Project. <br />Related Bristol at 3600 South Bristol Street <br />Land Residual Value Study Report <br />Exhibit 10 <br />September 27, 2023 <br />/ 25 <br />