Laserfiche WebLink
TABLE A <br />YEAR 2045 BUILDOUT PROJECT FAIR -SHARE COST CONTRIBUTION <br />(3) <br />(5) <br />(2) <br />Year 2045 <br />Year <br />Buildout Plus <br />Project <br />1 <br />() <br />2045 <br />Project Phases <br />( 4) <br />Fair - <br />Time <br />Existing <br />Buildout <br />1, 2 and 3 <br />Project <br />Share <br />Key Intersection <br />Jurisdiction <br />Period <br />Improvement Description <br />Traffic <br />Traffic <br />Traffic <br />Traffic <br />Percent <br />■ Restripe the existing <br />Bear Street at <br />Costa Mesa/ <br />AM <br />WB left -turn lane to <br />2,166 <br />2,788 <br />2,859 <br />71 <br />37 <br />SR-73 NB Ramps <br />Caltrans <br />PM <br />provide a shared <br />3,664 <br />4,706 <br />4,747 <br />41 <br />6.31 /o <br />left/right-turn lane <br />Note: <br />Project fair -share percentage, which considers both the AM peak hour and PM peak hour traffic volumes, is calculated as such: <br />Column (5) _ [Column (4)] / [Column (3) — Column (1)] x 100%. <br />