My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 25 - Related Bristol Specific Plan Ordinances Second Readings (3600 S Bristol Street)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
10/15/2024
>
Item 25 - Related Bristol Specific Plan Ordinances Second Readings (3600 S Bristol Street)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 6:00:46 PM
Creation date
10/8/2024 4:56:28 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
25
Date
10/15/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A to Exhibit 5 - Conditions of Approval for VTTM No. 2023-01 <br />per standard plans or approved street improvement plans. <br />Owner shall apply slurry seal with REAS Type II slurry along the project's frontage <br />to mitigate roadway damages due to construction and repair any major street <br />defects twice during project buildout. Additionally, Owner shall perform full depth <br />street restoration from the new curb and gutter to the edge of the first vehicle lane <br />line (to fully include the vehicle lane closest to curb) along the project frontage and <br />perform a 3" grind and overlay of the following street limits (inclusive of all <br />intersections): <br />a. Bristol Street: Southbound lanes between MacArthur Boulevard and <br />Sunflower Avenue <br />b. Sunflower Avenue: Westbound lanes between Bristol Street and westerly <br />property boundary <br />c. MacArthur Boulevard: Eastbound lanes between Plaza Drive and Bristol <br />Street <br />d. Plaza Drive: Northbound lanes immediately along Project frontage <br />Timing of improvements shall be as described in condition titled "Timing of <br />Improvements and Project Phasing" below. <br />13. New and Modified Traffic Signals. Owner shall construct or modify traffic signals <br />immediately surrounding the project boundaries, at their sole expense, as follows: <br />a. Bristol Street at MacArthur Boulevard. Modify existing traffic signal to <br />accommodate the intersection improvements. Remove and salvage <br />existing impacted traffic signal poles and replace with new traffic signal <br />poles to standard. Install new City approved controller and cabinet. Install <br />video detection camera system for entire intersection. Install accessible <br />pedestrian system ("APS") for entire intersection. Install new CCTV camera <br />per City specifications and any associated appurtenances as conceptually <br />illustrated in Exhibit A, attached. <br />b. Bristol Street at Callens Common. Modify existing traffic signal to <br />accommodate the intersection improvements. Remove and salvage <br />existing impacted traffic signal poles and replace with new traffic signal <br />poles to standard. Install new City approved controller and cabinet. Install <br />video detection camera system for entire intersection. Install APS for entire <br />intersection. Install new CCTV camera per City specifications and any <br />associated appurtenances as conceptually illustrated in Exhibit B, attached. <br />c. Bristol Street at Sunflower Avenue. Modify existing traffic signal to <br />accommodate the intersection improvements. Remove and salvage <br />existing impacted traffic signal poles and replace with new traffic signal <br />poles to standard. Install new City approved controller and cabinet. Install <br />Page 3 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.