My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 25 - Related Bristol Specific Plan Ordinances Second Readings (3600 S Bristol Street)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
10/15/2024
>
Item 25 - Related Bristol Specific Plan Ordinances Second Readings (3600 S Bristol Street)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 6:00:46 PM
Creation date
10/8/2024 4:56:28 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
25
Date
10/15/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A to Exhibit 5 — Conditions of Approval for VTTM No. 2023-01 <br />we <br />Project's frontage on the west side of Bristol Street between Sunflower Avenue <br />and MacArthur Boulevard, along the north side of Sunflower Avenue between <br />Bristol Street and western edge of the property, along the south side of MacArthur <br />Boulevard between Plaza Drive and Bristol Street, and along the east side of Plaza <br />Drive immediately along the Project frontage. Such new public street lights shall <br />be constructed in a phased manner to correspond to the phasing of the Project <br />and consistent with the phasing of the public street improvements. <br />Street Medians. As specified on the Vesting Tentative Tract Map, Owner shall <br />modify, at their sole expense, the public street medians along Bristol Street <br />between Sunflower Avenue and MacArthur Blvd, along Sunflower Avenue <br />between Bristol Street and the western edge of the Property, along Plaza Drive <br />between MacArthur and Callens Common, and construct new medians on <br />MacArthur Boulevard between Plaza Drive and Bristol Street. Medians shall be <br />constructed in a phased manner to correspond to the phasing of the Project and <br />consistent with the phasing of the public street improvements. <br />10. Bike Lanes. Owner shall, at their sole expense, stripe Class II buffered bike lanes <br />along the project's frontage on the west side of Bristol Street between Sunflower <br />Avenue and MacArthur Boulevard, along the north side of Sunflower Avenue <br />between Bristol Street and western edge of the property, along the south side of <br />MacArthur Boulevard between Plaza Drive and Bristol Street as shown on the <br />Vesting Tentative Tract Map. Bike lanes shall be installed in a phased manner to <br />correspond to the phasing of the Project and consistent with the phasing of the <br />public street improvements. <br />11. Sidewalks. Owner shall reconstruct, at their sole expense, the sidewalks <br />immediately along the Project's frontage on the west side of Bristol Street between <br />Sunflower Avenue and MacArthur Boulevard, along Sunflower Avenue between <br />Bristol Street and western edge of the property, along MacArthur Boulevard <br />between Plaza Drive and Bristol Street, and along the east side of Plaza Drive <br />immediately along the Project frontage, as shown on the Vesting Tentative Tract <br />Map. Sidewalks shall be installed in a phased manner to correspond to the phasing <br />of the Project and consistent with the phasing of the public street improvements. <br />12. Street Improvements. Owner shall construct, at their sole expense, new curb and <br />gutter along the project's frontage on the west side of Bristol Street between <br />Sunflower Avenue and MacArthur Boulevard, along the north side of Sunflower <br />Avenue between Bristol Street and western edge of the property, along the south <br />side of MacArthur Boulevard between Plaza Drive and Bristol Street, and along <br />the east side of Plaza Drive immediately along the Project frontage, as shown on <br />the Vesting Tentative Tract Map. Curb and gutter shall be installed in a phased <br />manner to correspond to the phasing of the Project and consistent with the phasing <br />of the public street improvements. <br />Owner shall complete full depth street trench restoration with all utility trench work <br />Page 2 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.