My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-053 - Final Supplemental for The Related Bristol Specific Plan Project
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2024
>
2024-053 - Final Supplemental for The Related Bristol Specific Plan Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2024 10:41:47 AM
Creation date
10/9/2024 10:31:30 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Agency
Planning & Building
Doc #
2024-053
Item #
26
Date
10/1/2024
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Evaluation of Alternatives <br />Alternative I — No Pro ject/No Build Alternative <br />The No Proiect/No Build Alternative would avoid the significant and unavoidable air quality, and <br />parks and recreation impacts that would occur from the proposed Project. Additionally, operational <br />impacts would be reduced and mitigation measures, which include measures related to air quality, <br />cultural resources, geology and soils, greenhouse gas emissions, hazards and hazardous materials, <br />noise, and tribal cultural resources, would not be required. However, the environmental benefits of <br />the Project would also not be realized, such as implementation of the General Plan DC-5 land use <br />and South Bristol Street Focus Area objectives, improvements to offsite bicycle lanes, sidewalks, and <br />stormwater infrastructure, CALGreen,/DAMP/LI D infrastructure improvements to storm water <br />quality, and a reduction of drainage runoff from the area, removal of potentially contaminated <br />soils, provision of housing within TPAs and High Quality Transit Areas, improvements to the <br />jobs/'housing balance, and the potential to reduce vehicle miles traveled. <br />The No Project No Build Alternative would not meet any of the Project objectives. The site would <br />not be redeveloped to provide housing to help meet the region's demand for housing, would not <br />provide a development consistent with other regional redevelopment in the South Bristol Street <br />Focus Area, would not develop housing to assist the City in meeting its jobs,/housing balance, would <br />not provide onsite uses that reduce VMT, and would not implement SCAG RTP%SCS policies related <br />to providing additional housing near employment centers. Overall, this alternative would not meet <br />any of the objectives of the proposed Project (Draft Supplemental EIR, pp. 6-1 2 through 6-1 3). <br />Finding: The City of Santa Ana finds that the No Project/'No Build Alternative would not redevelop <br />the site to provide development consistent with other regional redevelopment in the South Bristol <br />Street Focus Area, would not develop housing to assist the City in meeting its jobs/'housing balance, <br />would not provide onsite uses that reduce VMT, and would not implement SCAG RTP/SCS policies <br />related to providing additional housing near employment centers. Overall, the No Project,/No Build <br />Alternative fails to meet any of the Project objectives (Draft Supplemental EIR at p. 6-12) and is <br />rejected on that basis. <br />Alternative 2 — Reduced Project Alternative <br />The Reduced Project Alternative would result in 2,722 fewer daily vehicular trips than the proposed <br />Project. The reduction in vehicular emissions and consumer products from this alternative would <br />reduce operational air quality impacts to a less than significant level. However, significant and <br />unavoidable impacts related to construction air quality emissions would continue to occur and <br />cumulative parkland deficiencies from implementation of this alternative. Additionally, the <br />mitigation required for implementation of the proposed Project would continue to be required for <br />the Reduced Project Alternative to reduce impacts related to air quality, cultural resources, geology <br />and soils, greenhouse gas emissions, hazards and hazardous materials, noise, and tribal cultural <br />resources to a less than significant level. Overall, although the volume of impacts would be less by <br />the Reduced Project Alternative in comparison to the proposed Project, the Reduced Project <br />Alternative would not eliminate all of the significant and unavoidable impacts of the proposed <br />Project or eliminate the need for mitigation. Furthermore, the Reduced Project Alternative would <br />result in a reduced beneficial impact. Providing less commercial space and no hotel space on the <br />
The URL can be used to link to this page
Your browser does not support the video tag.