My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2024-10-15
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
10/15/2024
>
Agenda Packet_2024-10-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2024 1:57:56 PM
Creation date
10/9/2024 1:47:55 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
10/15/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Final Initial Study and Mitigated Negative Declaration <br />Mitigation Monitoring and Reporting Plan 5-4 October 2024 10th and Flower Street Park Project 2023-145 <br />Table 5-1. 10th and Flower Street Park Project Mitigation Monitoring and Reporting Plan <br />Mitigation Measure Monitoring Activity/ Timing/ Frequency <br />Implementation Responsibility/ Verification <br />Responsibility for Oversight of Compliance/ Verification <br />Outside Agency Coordination Comments <br />activities shall not occur within any <br />disturbance limit buffer zones until <br />the nest is deemed inactive by the <br />qualified biologist. <br />Cultural Resources Mitigation Measures <br />CUL-1: Contractor Awareness Training <br />Program. The City of Santa Ana shall <br />ensure that a Contractor Awareness <br />Training Program about cultural <br />resources is delivered to train <br />equipment operators. The program <br />shall be designed to inform <br />construction personnel about: federal <br />and state regulations pertaining to <br />cultural resources and tribal cultural <br />resources; the subsurface indicators <br />of resources that shall require a work <br />stoppage; procedures for notifying <br />the City of any occurrences; project- <br />specific requirements and mitigation <br />measures; and enforcement of <br />Activity: <br />Contractor <br />Awareness <br />Training Program. <br /> <br />Timing: <br />Prior to <br />construction. <br /> <br />Frequency: <br />As necessary <br />during <br />construction. <br />Qualified <br />Archaeologist <br /> <br /> <br /> <br /> <br />Initials <br /> <br /> <br /> <br />Date <br /> <br />City of Santa Ana <br /> <br /> <br /> <br /> <br /> <br />Initials <br /> <br /> <br /> <br />Date <br /> <br />None. <br /> <br /> <br />City Council 12 – 55 10/15/2024
The URL can be used to link to this page
Your browser does not support the video tag.