Laserfiche WebLink
Final Initial Study and Mitigated Negative Declaration <br />Mitigation Monitoring and Reporting Plan 5-5 October 2024 10th and Flower Street Park Project 2023-145 <br />Table 5-1. 10th and Flower Street Park Project Mitigation Monitoring and Reporting Plan <br />Mitigation Measure Monitoring Activity/ Timing/ Frequency <br />Implementation Responsibility/ Verification <br />Responsibility for Oversight of Compliance/ Verification <br />Outside Agency Coordination Comments <br />penalties and repercussions for non- <br />compliance with the program. <br />The training shall be prepared by a <br />qualified professional archaeologist <br />and may be provided either through a <br />brochure, video, or in-person tailgate <br />meeting, as determined appropriate <br />by the archaeologist. The training <br />shall be provided to all construction <br />supervisors, forepersons, and <br />operators of ground-disturbing <br />equipment. All personnel shall be <br />required to sign a training roster. The <br />construction manager is responsible <br />for ensuring that all required <br />personnel receive the training. The <br />Construction Manager shall provide a <br />copy of the signed training roster to <br />the City as proof of compliance. <br />  <br />  <br />City Council 12 – 56 10/15/2024