My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LOS ANGELES ENGINEERING, INC. (BRISTOL ST. IMPROVEMENTS FROM CIVIC CENTER TO WASHINGTON)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
LOS ANGELES ENGINEERING, INC. (BRISTOL ST. IMPROVEMENTS FROM CIVIC CENTER TO WASHINGTON)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2026 10:47:50 AM
Creation date
10/15/2024 11:19:23 AM
Metadata
Fields
Template:
Contracts
Company Name
LOS ANGELES ENGINEERING, INC. (BRISTOL ST. IMPROVEMENTS FROM CIVIC CENTER TO WASHINGTON)
Contract #
P13-6792, P15-6445
Agency
Public Works
Council Approval Date
9/17/2024
Expiration Date
1/1/1900
Insurance Exp Date
4/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CI i Y OF SANTA ANA <br /> PUBLIC WORKS AGENCY <br /> — CONTRACT CHANGE ORDER <br /> Project Number Project 13-6792 & 15-6445—Bristol Street Improvements from Change Order Number 2 <br /> Civic Center Drive to Washington Avenue and Bristol Street(Phase <br /> 3A)Water Main Improvements <br /> To Los Angeles Engineering, Inc. Contractor <br /> You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br /> specifications on this contract. <br /> NOTE:THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br /> Unless otherwise stated,rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br /> Change requested by PUBLIC WORKS AGENCY <br /> EXTRA WORK AT AGREED PRICE <br /> 1. To demolish the existing wall along the east side of Bristol St. that was in conflict with the <br /> proposed sound wail per PCO #9 dated November 3, 2025. <br /> AGREED COST: $10,154.14 <br /> 2. To procure a scrim illustrating funding sources for the Bristol Street Improvements projects per <br /> PCO #11 dated September 15, 2025. <br /> AGREED COST: $10,582.43 <br /> 3. To extend the handrails at the bus island ramps per PCO #21 dated October 9, 2025. <br /> AGREED COST: $9,272.18 <br /> 4. To construct masonry tie-in walls from the end of the new sound wall to existing masonry at <br /> three (3) locations per PCO #22 dated August 6, 2025. <br /> AGREED COST: $14,988.50 <br /> 5. To construct a masonry tie-in wall from the end of the new sound wall to the existing masonry <br /> wall at In-N-Out per PCO #23 dated August 26, 2025. <br /> AGREED COST: $3,333.00 <br /> 6. To place 130 5-gallon plants and mulch on the west side of Bristol between 911 St. and 10t" St. <br /> per PCO#24 dated October 14, 2025. <br /> AGREED COST: $8,165.50 <br /> Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.