My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LOS ANGELES ENGINEERING, INC. (BRISTOL ST. IMPROVEMENTS FROM CIVIC CENTER TO WASHINGTON)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
LOS ANGELES ENGINEERING, INC. (BRISTOL ST. IMPROVEMENTS FROM CIVIC CENTER TO WASHINGTON)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2026 10:47:50 AM
Creation date
10/15/2024 11:19:23 AM
Metadata
Fields
Template:
Contracts
Company Name
LOS ANGELES ENGINEERING, INC. (BRISTOL ST. IMPROVEMENTS FROM CIVIC CENTER TO WASHINGTON)
Contract #
P13-6792, P15-6445
Agency
Public Works
Council Approval Date
9/17/2024
Expiration Date
1/1/1900
Insurance Exp Date
4/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. For additional saw cut joints on the sidewalk along Bristol St. to prevent cracking per PCO #26 <br /> dated September 23, 2025. <br /> AGREED COST: $21,790.98 <br /> 8. To install green MMA striping for the bike lanes to increase visibility per PCO #29 dated <br /> January 13, 2026. <br /> AGREED COST: $16,573.90 <br /> 9. To upgrade the irrigation controller box to allow for a larger irrigation controller and to avoid <br /> overheating in the unit per PCO#30 dated January 22, 2026. <br /> AGREED COST: $3,348.05 <br /> 10. To install temporary traffic control in front of Santa Ana College in the southbound direction to <br /> enhance visibility and safety per PCO #31 dated February 4, 2026. <br /> AGREED COST: $5,937.34 <br /> 11. Credit to the City for using single split face block in lieu of double split face block per PCO#10 <br /> dated February 24, 2026. <br /> AGREED COST: ($10,000.00) <br /> 12. Credit to the City for installing wall cap with incorrect finish. <br /> AGREED COST: ($449.73) <br /> 13. To install crushed miscellaneous base within the lot east of Bristol St. to eliminate pollutant <br /> runoff into the storm drains per PCO#32 dated March 2, 2026. <br /> AGREED COST: $33,507.86 <br /> 14. Replace existing drive approach with sidewalk and curb and gutter to eliminate non-authorized <br /> parking and allow SCE pole improvements per the original plans per PCO #33 dated March 24, <br /> 2026. <br /> AGREED COST: $12,000.00 <br /> TOTAL AGREED COST: $139,204.15 <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.