Laserfiche WebLink
3RD FLOOR5TH FLOORUNIT LIVING SPACE1-HR FLR / CLGASSEMBLY TYP.12" CONCRETE1-HR FLR / CLGASSEMBLY TYP.6TH FLOOR7TH FLOOR1-HR. ROOF/CLGASSEMBLYNO OPENING IN ROOF WITHIN10 FEET OF FIREWALLOF FIREWALL1- HR. ROOF / CLGASSEMBLY TYP.FIREWALLWIDTHDOUBLE FIRE WALL PERNFPA 22191AD-219AD-211AD-211AD-211AD-211AD-219AD-21EXPANSION JOINT @ ROOF3AD-331-HR FLR / CLGASSEMBLY TYP.1-HR FLR / CLGASSEMBLY TYP.1-HR FLR / CLGASSEMBLY TYP.3-HR CONC. FLR / CLGASSEMBLY17AD-2122AD-223-HR CONCRETEBEARING WALL2-HR CONC. FLR / CLGASSEMBLY13AD-2122AD-223-HR CONCRETEBEARING WALL5 STORIES TYPE IIIAO/ 2 STORIES TYPE IA5 STORIES TYPE IIIAON-GRADE2-HR FIREWALL22AD-223-HR CONC. BEARINGWALL2-HR FIRE WALL9-TERMINATE FIRE WALL AT2 LAYERS OF 5/8" THICKTYPE 'X' GYP. BD.8 5/8"SEISMIC GAP2-HR FIRE WALL9DOUBLE 2-HR FIREWALL INLIEU OF 3-HR4THESE STUDS SHOULDBE 1-5/8" IN WIDTH &SHOW INSULATION9-2-HR FIREWALLDOUBLE 2-HR FIREWALL INLIEU OF 3-HR FIREWALL4STUCCO FINISH TO BEAPPLIED OVER FIRERATED WALL ASSEMBLY2-HOUR STEEL DOUBLEEGRESS JAMBFULL HEIGHTSEMI-CONCEALED HINGE2-HOUR METAL DOOR2-HOUR RATED FIREWALL PER DETAIL9-DOOR IN OPENPOSITION, BEYOND2-HOUR RATED DOOR & FRAME,INSTALL PER MANUFACTURERSINSTRUCTIONS.TYPICAL RATEDCORRIDOR FLOOR /CEILING PER DETAIL2-HOUR RATED FIRE WALL9-10AD-33SIM.11AD-332-HOUR RATED DOOR & FRAME,INSTALL PER MANUFACTURERSINSTRUCTIONS.2-HOUR RATED FIRE WALL9-TYPICAL RATEDCORRIDOR FLOOR /CEILING PER DETAILTYPICAL RATEDCORRIDOR FLOOR /CEILING PER DETAILBA18AD-25DOUBLE 2-HRFIREWALL PER NFPA221 IN LIEU OF 3-HRFIRE WALLAD-25ACCOPYRIGHTIt is the clients responsibility prior to or during construction to notify the architect in writingof any perceived errors or omissions in the plans and specifications of which a contractorthoroughly knowledgeable with the building codes and methods of construction shouldreasonably be aware. Written instructions addressing such perceived errors or omissionsshall be received from the architect prior to the client or clients subcontractors proceedingwith the work. The client will be responsible for any defects in construction if theseprocedures are not followed.Architecture + Planning17911 Von Karman Ave.Suite 200Irvine, CA 92614ktgy.com949.851.2133License StampProject Contact:Email:Principal: Project Designer:Project Director:KTGY Project No:2017-0934Debbie Hollanddholland@ktgy.comWil WongD. SchoolmeesterDebbie HollandDeveloperPHONE NO.4199 CAMPUS DRIVEIRVINE, CA 92612(714) 342-2502415 & 515 E. 4TH STREET, SANTA ANA, CA 92701 <br />4TH AND MORTIMERNo.Date Description06-21-2023 FIFTH BUILDING DEPARTMENT SUBMITTALA06-21-23ADDENDUM ADOUBLE CROSS CORRIDOR DOORS123-HOUR FIREWALL20910111643-HR FIRE WALL @ EXT. WALL - CONC.2-HR FIREWALL-DOUBLE 2-HR FIRE WALL IN LIEU OF 3-HR3-HR FIRE WALL @ EXT. WALL - WOODA2-HR RATED DOOR JAMBB2-HR RATED DOOR HEADAAAAA06-21-23