My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PCN3, INC. (NEWHOPE LIBRARY MODERNIZATION & DELHI LIBRARY BRANCH IMPROVEMENTS)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
PCN3, INC. (NEWHOPE LIBRARY MODERNIZATION & DELHI LIBRARY BRANCH IMPROVEMENTS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2025 4:23:43 PM
Creation date
11/19/2024 2:14:19 PM
Metadata
Fields
Template:
Contracts
Company Name
PCN3, INC.
Contract #
P22-1802, 23-1385
Agency
Public Works
Council Approval Date
9/17/2024
Insurance Exp Date
1/13/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-• CITY OF SANTA ANA <br /> _i PUBLIC WORKS AGENCY <br /> T- I CONTRACT CHANGE ORDER <br /> Project Number Project No. 22-1382, 22-1802; Newhope Library Modernization & Change Order Number 2 <br /> Delhi Library Branch Improvements <br /> To PCN3, Inc. Contractor <br /> You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br /> specifications on this contract. <br /> NOTE:THIS CHANCE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br /> Unless otherwise stated,rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br /> Change requested by PUBLIC WORKS AGENCY <br /> JUSTIFICATION <br /> 1. To compensate the contractor for labor and materials required to replace 4x4 posts mistakenly <br /> removed due to a conflict between Demo Plan A01.3 and Structural Plan S-2-1 (PCO #003). <br /> AGREED COST: $8,765.99 <br /> 2. To compensate the contractor for furnishing and installing CS3-GR-BUNDLE-2 irrigation <br /> controller and data plan per RFI #08 and City directive dated December 18, 2024 (PCO #004). <br /> AGREED COST: $4,146.68 <br /> 3. To compensate the contractor for removal of VCT flooring in the General Stacks Room per RFI <br /> #09 and updated finish requirements (PCO #007). <br /> AGREED COST: $2,588.98 <br /> 4. To compensate the contractor for hazardous material abatement services including asbestos, <br /> lead, and universal waste removal per RFI #03 and abatement survey (PCO#008). <br /> AGREED COST: $36,567.42 <br /> 5. To compensate the contractor for replacing non-functional exterior light fixtures and associated <br /> electrical and wall repair work per RFI #28 and Bulletin No. 1 (PCO #009). <br /> AGREED COST: $38,816.78 <br /> 6. To compensate the contractor for framing, wall, and structural connection modifications per <br /> RFIs#20, #27, #26, #29, #44, and #47 (PCO#010). <br /> AGREED COST: $28,156.01 <br /> 7. To compensate the contractor for structural beam replacement and roof sheathing conflict <br /> resolution per RFI #46 (PCO#011). <br /> AGREED COST: $8,624.15 <br /> 8. To compensate the contractor for modifying and relocating ductwork in conflict with new Hardy- <br /> Frame panels per RFI #30 (PCO #015). <br /> AGREED COST: $6,435.36 <br /> Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.