My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PCN3, INC. (NEWHOPE LIBRARY MODERNIZATION & DELHI LIBRARY BRANCH IMPROVEMENTS)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
PCN3, INC. (NEWHOPE LIBRARY MODERNIZATION & DELHI LIBRARY BRANCH IMPROVEMENTS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2025 4:23:43 PM
Creation date
11/19/2024 2:14:19 PM
Metadata
Fields
Template:
Contracts
Company Name
PCN3, INC.
Contract #
P22-1802, 23-1385
Agency
Public Works
Council Approval Date
9/17/2024
Insurance Exp Date
1/13/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9. To compensate the contractor for hardware revisions and added panic hardware at Door#4 per <br /> RFI #62 and OAC direction on 2/18/25 (PCO #016). <br /> AGREED COST: $3,907.75 <br /> 10. To compensate the contractor for removal and disposal of existing chair rail per RFI #18 and <br /> AOR direction (PCO #018). <br /> AGREED COST: $1,268.45 <br /> 11. To compensate the contractor for removal and replacement of existing VCT flooring at the <br /> hallway and entrance per City request (PCO#021). <br /> AGREED COST: $40,484.15 <br /> 12. To compensate the contractor for the cost difference due to the substitution of E1 light fixtures <br /> with BEGA#84961-STD units per RFI#48 and City direction (PCO#022). <br /> AGREED COST: $8,024.00 <br /> 13. To compensate the contractor for furnishing and connecting a new irrigation controller assembly <br /> per Approved Submittal #62 (PCO#023). <br /> AGREED COST: $10,119.40 <br /> 14. To compensate the contractor for fire alarm troubleshooting and resolution of five control panel <br /> issues identified during the safe-off process (PCO #024). <br /> AGREED COST: $1,624.49 <br /> 15. To compensate the contractor for revised conduit routing and roof penetrations for power cables <br /> per RFI #49 and Alpha MEP approval (PCO#025). <br /> AGREED COST: $27,712.99 <br /> 16. To compensate the contractor for enclosing and rerouting MC and low-voltage cables per RFI <br /> #63 and General Note D on Sheet E102D (PCO#027). <br /> AGREED COST: $11,690.83 <br /> 17. To compensate the contractor for furnishing and installing ten (10) new CAT6 cables from <br /> MPOE to OF cabinet per RFI #40 (PCO#030). <br /> AGREED COST: $5,556.43 <br /> 18. To compensate the contractor for installation of a missing condensate drain line for AC-1 per <br /> RFl #125 and Submittal #41 (PCO #037). <br /> AGREED COST: $4,759.64 <br /> TOTAL AGREED COST: $249,249.50 <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.