My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 13 - Fiscal Year 2023-2024 General Fund Results
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
12/17/2024
>
Item 13 - Fiscal Year 2023-2024 General Fund Results
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2024 11:43:20 AM
Creation date
12/11/2024 9:43:44 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Item #
13
Date
12/17/2027
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fiscal Year 2023-2024 General Fund Results <br />December 17, 2024 <br />Page 4 <br />occurred that were not included in the budget, including $100,000 for elevator repairs in <br />the Fleet Division and $140,000 for necessary fire panel repairs. Staff is requesting a <br />one-time funding allocation of $240,000 to cover these critical, unanticipated repairs. <br />Parks Projects in Progress <br />Due to a process -related oversight, $555,600 in carryovers were not included in the <br />October 1, 2024 request for the carry-over of unspent amounts from FY23-24 to FY24- <br />25. As a result, Public Works is requesting to re -budget unspent FY23-24 appropriations <br />totaling $555,600 to complete the design and construction phases for the following <br />parks projects: <br />• Cool pavement treatment at Madison and Campesino Parks <br />• El Salvador Park concession stand <br />• Edna Park and restroom improvements <br />• Thornton Park playground <br />Enaineerina Services Division Fund Close -Out <br />On December 19, 2023, staff reported that the Engineering Services Division has been <br />managing a negative fund balance for several years. To address this issue and prepare <br />for the fund's eventual closure, the City Council approved a FY 2024-25 annual budget <br />allocation within the General Fund to cover overhead costs and staff time that cannot be <br />billed to projects or developer deposits. <br />At this stage, staff is requesting authorization to transfer all related expenditures and <br />revenues from the Engineering Services Division fund to the General Fund to close the <br />fund. An additional $1.25 million allocation is required to fully address the negative fund <br />balance from FY 23-24, which resulted from unanticipated costs. This one-time funding <br />allows for a clean closure of the fund. <br />Although the Engineering Services fund has a budget of approximately $6.7 million, only <br />$5.4 million will shift to the General Fund due to indirect cost recovery. The General <br />Fund charges overhead costs to other funds, including the Engineering Services fund. <br />These overhead costs are for accounting, legal assistance, and contract processing. By <br />moving Engineering Services to the General Fund, the General Fund will not charge <br />itself for these indirect overhead services. <br />The City's General Fund Reserve policy requires maintaining a reserve balance equal <br />to 18% of annual recurring revenue. With an anticipated $5.4 million increase of <br />General Fund recurring revenue from the Engineering Services Division, the 18% <br />Reserve must increase by $977,371. This action ensures compliance with the reserve <br />policy, further supporting the City's fiscal stability. <br />Contribution to Section 115 Trust for Pension Stabilization <br />In line with the City Council approved Unfunded Employee Pension Liability Cost <br />Reduction Policy, staff recommends a one-time $2 million contribution of the excess <br />
The URL can be used to link to this page
Your browser does not support the video tag.