Laserfiche WebLink
Ali Bastani, PhD, PE, GE, F. ASCE <br />GMU GECITECHNICAL, INC. <br />Geotechnical Engineering <br />Dr. Ali Bastani's professional experience entails performance, management and <br />providing practical solutions for variety of projects including: (1) Geotechnical <br />investigation and monitoring for foundation design of bridges, water reservoirs, <br />pipelines, power plants, commercial and industrial facilities, and landfills; <br />WZY, <br />/ 2 Seismic round motion studies site response analysis, liquefaction <br />() g P Y q <br />REGISTRATION analysis, determination of seismic induced deformations, and seismic retrofit <br />1999/CA/Geotechnical evaluations; (3) Deep-seated and shallow landslide investigation, analysis, <br />Engineer/2458 and mitigation; (4) Design of shoring and stabilization systems including tie <br />1995/CA/Professional back and soil nail retaining structures (5) Groundwater flow and contaminant <br />Engineer/Civil/53924 transport evaluation and modeling; and (6) Seismic hazard evaluation, <br />probabilistic and deterministic, for various seismic zones around the United <br />EDUCATION States and abroad. <br />PhD/Civil and <br />Environmental <br />Engineering/University of Experience <br />California, Davis <br />MS/Civil and Environmental La Palma Complex Reservoir Rehabilitation and Pump Station <br />Engineering/University of Replacement - Anaheim, CA: Geotechnical Engineer of Record for design of <br />California, Davis a new roof system for a 4 MG and replacement of an existing pump station. The <br />BS/Civil Engineering/ new pump station will be constructed at the base of an existing 3 MG reservoir <br />Polytechnic of Tehran <br />at the complex. The 3 MG reservoir will be removed and backfilled after <br />EXPERIENCE construction of the new pump station. <br />With GMU Geotechnical, Cerritos Avenue Siphon Elimination - Anaheim, CA: Geotechnical Engineer <br />Inc. for 9 years; with other <br />firms for 19 years of Record for design of approximately 2,900 LF of sewer lines to remove or <br />replace Cerritos Avenue siphon in Anaheim. <br />Tesoro (2) Reservoirs, Pipelines and Access Road, Santa Margarita <br />Water District - Rancho Mission Viejo, CA: Geotechnical Engineer of Record <br />during design and construction of 3 MG and 2 MG reservoirs for providing <br />potable and recycled water to Planning Area 2 of Rancho Mission Viejo. This <br />project also included 1.4 miles of potable and recycled transmission mains <br />and 0.8 miles of access roads along the eastern side and southern terminus of <br />Chiquita Canyon in Rancho Mission Viejo. <br />San Juan Creek Improvement, Orange County Public Works - San <br />Juan Capistrano and Dana Point, CA: Project Manager/Engineer in charge <br />of providing geotechnical design recommendations for mitigation of more <br />than a mile of levees along San Juan Creek in the Cities of San Juan Capistrano <br />and Dana Point. The proposed levee improvements were aimed to increase the <br />channel capacity and minimize the adverse effects of erosion and scouring <br />along the channel concrete lined slopes, which resulted in undermining and <br />failure of portions of the creek levee during the January 2005 storms. Stability <br />of levees was evaluated under static and dynamic conditions and mitigation <br />measures were provided. <br />Syphon Dam and Reservoir, Irvine Ranch Water District - Orange <br />County, CA: Geological study, geotechnical evaluation and analyses of reservoir <br />