My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Approve Agreements for Agreements for On-Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
08/16/2022 Regular
>
Item 15 - Approve Agreements for Agreements for On-Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 9:41:59 AM
Creation date
12/18/2024 8:22:07 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
15
Date
8/16/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ali Bastani, PhD, slopes, and overall grading logistic study for the proposed 5,000-acre-feet <br />PE, GE, F. ASC E recycled water reservoir which will replace the existing dam. <br />(Continued) Trampas Canyon Dam and Reservoir, Santa Margarita Water District - <br />Orange County, CA: Geotechnical Quality Assurance during construction of <br />the 5,000-acre-feet recycled water reservoir that included construction of three <br />earth fill embankment dams, a spillway, inlet/outlet works, pump station, and <br />other appurtenant structures. <br />Santa Ana Delhi Channel, Orange County Public Works - Newport <br />Beach, CA: Project Manager in charge of providing geotechnical design <br />recommendations for 35% design for the proposed channel modifications <br />downstream of Mesa Drive (STA 39+90) to Upper Newport Bay (STA 5+52) in <br />the City of Newport Beach, California. Our investigations included 12 cone <br />penetration tests and review of available geotechnical borings. The analyses <br />included sheet pile wall design recommendations for increasing the channel <br />capacity and mitigating the channel banks erosion and providing geotechnical <br />recommendations in support of a Type Selection Report for the proposed <br />pedestrian bridge replacements. <br />Greenville -Banning Channel (1303) Rehabilitation, Orange County Public <br />Works - Santa Ana, CA: Project Manager in charge of providing geotechnical <br />design recommendations for channel slope repairs from Centennial Road to <br />West Segerstrom Avenue in Santa Ana. Our investigations included ten hollow - <br />stem -auger borings and vertical and horizontal hand auger borings at seven <br />locations to evaluate the existing slope conditions. A reinforced earth option <br />was evaluated for stabilizing the channel slopes against erosion. <br />Fullerton Creek Channel Improvement, Orange County Public Works - <br />Buena Park, CA: Project Manager in charge of providing geotechnical design <br />recommendations for groundwater monitoring and design recommendations <br />for the proposed channel modifications between Western Avenue (STA 105+80) <br />and Dale Street (STA 167+00). Our investigations included four groundwater <br />monitoring wells, seven dynamic cone penetration tests, eight borings, and <br />fifteen cone penetration tests. Our field investigations were coordinated with <br />the City of Buena Park, County of Orange, and property owners adjacent the <br />channel. The analyses included soil nail wall designs for three overcrossings <br />and finite difference numerical modeling for evaluation of the construction <br />induced deformations during shoring installation, excavation, installation of <br />the concrete channel, and release of restrains. <br />Gobernadora Multi Purpose Basin, Santa Margarita Water District <br />- Orange County, CA: Geotechnical Engineer of Record during design and <br />construction of 130 acre-feet basin south of Coto de Caza. This basin collects, <br />purifies, and percolates niceness water from Coto de Caza run offs, which is <br />pumped to a recycled water reservoir for reuse. <br />
The URL can be used to link to this page
Your browser does not support the video tag.