Laserfiche WebLink
I Proposal For <br />SN6J On -Call Water Resources Engineering Services <br />enhancing streetscape aesthetics with landscape and hardscape features to create a more inviting <br />and pleasant urban area; improving street walkable paths with pedestrian safety, curb ramps, <br />crosswalks, and other ADA features; encouraging the use of alternative transportation such as walking, <br />biking, and public transit; improving accessibility to local businesses by providing on street parking; <br />creating a low impact and sustainable design for improvements while considering environmental <br />issues; and enhancing corridor safety and security by adding high visibility crosswalks and pedestrian <br />level street lights. <br />Year Completed: Ongoing <br />Client Name: City of Santa Ana <br />Contact Information: Suzi Furjanic, Associate Planner, 714.571.4241 <br />Kimley-Horn Project Manager: Darren Adrian, P.E. <br />Fisher Park Neighborhood Water Main Improvements, Santa Ana, CA <br />Kimley-Horn provided PS&E services for Fisher Park Neighborhood Water Main Improvements that <br />included improving and upgrading approximately 9500 feet of water main and over 200 laterals. <br />Year Completed: 2021 <br />Client Name: City of Santa Ana <br />Contact Information: Suzi Furjanic, Associate Planner, 714.571.4241 <br />Kimley-Horn Project Manager: Darren Adrian, P.E. <br />Warner Avenue Street Improvements, Santa Ana, CA <br />Kimley-Horn is providing PS&E services for Warner Avenue between Wright Street and Oak Street <br />to expand the roadway from two lanes in each direction to three in each direction. Part of this work <br />includes improving and upgrading the surrounding storm drain infrastructure, including a new 60-inch <br />storm drain within Warner Avenue. This involves coordination with multiple stakeholders, including <br />utilities for overhead power lines; industrial, commercial, residential, and City fire and schools directly <br />affected by the widening; and OCTA who uses both Grand Avenue (a major cross street) and Warner <br />Avenue as transit routes. <br />Year Completed: Ongoing <br />Client Name: City of Santa Ana <br />Contact Information: Suzi Furjanic, Associate Planner, 714.571.4241 <br />Kimley-Horn Project Manager: Darren Adrian, P.E. <br />OC Streetcar Peer Review, Orange County, CA <br />Kimley-Horn provided peer review of the streetcar design for various technical areas such as track <br />alignment, grade crossings, stations, signalization, OCS, TPSS, constructability, basic operations, <br />and overall coordination of the proposed corridor with bicycles, pedestrians, buses and other vehicles. <br />The OC Streetcar will increase transportation options and provide greater access to a 4.15-mile route <br />along Santa Ana Boulevard, 4th Street, and the Pacific Electric right-of-way to Harbor Boulevard <br />in Garden Grove. <br />Year Completed: 2019 <br />Client Name: City of Santa Ana <br />Contact Information: Jason Gabriel, Principal Civil Engineer, 714.647.5664 <br />Kimley-Horn Project Manager: Darren Adrian, P.E. <br />City of Santa Ana ' IWOC77003.22 Kimley>>>Horn 18 <br />