My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Approve Agreements for Agreements for On-Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
08/16/2022 Regular
>
Item 15 - Approve Agreements for Agreements for On-Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 9:41:59 AM
Creation date
12/18/2024 8:22:07 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
15
Date
8/16/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Huitt-Zollars prepared construction documents for 2.5 miles of stormdrain <br />improvements with RCP pipe sizes up to 96 inch diameter, for the master - <br />planned Cypress Avenue storm drain (MPD Line T-2). The facilities start at <br />Sierra Avenue and drain west to the intersection of Cypress Avenue and <br />Foothill Boulevard and continue southbound on Cypress Avenue to connect <br />to the County 9'x7' West Fontana Channel lateral near the intersection with <br />Orange Way. A detailed Composite Utility Plan was created using base files <br />and record drawings gathered from wet and dry utility companies. The Plan <br />served as a key support to identify the most efficient horizontal and vertical <br />alignments, along with the definition of a trench detail. <br />A feasibility evaluation for curb, sidewalk, and accessibility improvements was performed to identify design <br />alternatives and itemize potential repairs. Street Improvements include 3,000 lineal feet of raised landscaped <br />medians, two traffic signal modifications; widening the Foothill/Juniper intersection; 1.25 miles ofADA retrofit of all <br />sidewalks, curb ramps, and driveway approached; and 2.25 miles of pavement rehabilitation. Aconstruction phasing <br />plan was also prepared to minimize impacts on local traffic and residents. <br />The project includes I RELEVANT DESIGN <br />the preparation of plan, <br />specification and estimates <br />for the storm drain, street, <br />and utility relocation plans. <br />CLIENT CONTACT: <br />City of Fontana <br />Chris Smethurst <br />Associate Engineer <br />909.350.6649 <br />CSmethurst@fontana.org 1J <br />COMPONENTS: <br />• Stormdrain design <br />• Utility relocations <br />. • Street Improvements <br />• Signal design <br />• ADA Design <br />• Traffic Control <br />Huitt-Zollars has been assisting the City with its Stormwater Implementation <br />Program, providing a wide range of services including the preparation of: <br />• Retrofit study of existing City pump stations (Bartlett, Hamilton, Talbert, <br />Atlanta) to incorporate full capture trash screens and media to capture <br />pollutants of concern. Mapping of subsurface utilities and operational <br />capabilities to defne a conceptual design for inclusion into the CIP program. <br />Construction documents for LID and Trash BMPs including the McCallen <br />Park Water Quality Improvements to remove trash and debris from more than 2 square miles. Design challenges <br />included shoring for a 32-foot deep pit, relocation of SCE and SCG lines, contaminated soil, as well as coordination with <br />the Boys and Girls Club. <br />BMP Feasibility Study and Master Planning including the Citywide Trash Compliance <br />Plan based on the citywide storm drain, which resulted in the identifcation of more <br />than 70 retroft opportunities. An emphasis on Regional BMPs, including inftration <br />BMPs, bioftration BMPs, and large-scale hydrodynamic separators has proven to <br />be cost effective based on long-term maintenance costs. A BMP sitting feasibility <br />was performed to determine pollutant load reduction, fow capacity, fooling <br />impacts, and traffc impacts during construction. BMP opportunities were validated <br />by assessing the presence of potential easements, utility conficts, and hydraulic <br />gradients. Preliminary engineer's estimates of probable costs and fact sheets were <br />created for each opportunity. <br />CLIENT CONTACT: <br />City of Huntington Beach <br />Jim Merid <br />714.375.8445 <br />jim.merid@surfcity-hb.org <br />H' I 1 1 ZOLL� City of Santa On -Call Water Resources Engineering Services RFP No. 22-002 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.