My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Approve Agreements for Agreements for On-Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
08/16/2022 Regular
>
Item 15 - Approve Agreements for Agreements for On-Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 9:41:59 AM
Creation date
12/18/2024 8:22:07 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
15
Date
8/16/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Oxnard Village is an approximately 60-acre privately funded <br />redevelopment project located at the westerly gateway to the City <br />of Oxnard, along the 101 Freeway. The under-utilized site contained <br />` . 1950's era motel, mobile home park, retail/commercial and light <br />manufacturing uses. This mixed use project will ultimately include <br />1,500 residential units with row -houses, podium stacked flats, live- <br />-All �� �-` work units and luxury high rise condominiums and luxury hotels. Four <br />parking lots have already been designed which included aesthetic, <br />�- decorative lighting, water quality, space, enhanced paving, vehicular, <br />pedestrian and disabled access, as well as drainage challenges. <br />In each case, both a functional and aesthetically pleasing built <br />environment resulted. The project is ongoing and will continue development while serving the City of Oxnard for <br />many decades into the future. <br />RELEVANT DESIGN <br />COMPONENTS: <br />• Street Improvements <br />• Sewer, Domestic Water <br />• Reclaimed Water <br />• Storm Drain <br />• Flood Control <br />• Mulitple Parking Lots <br />• Landscaping <br />• Water Quality <br />• Vehicular & Disabled Access <br />Huitt-Zollars was responsible for the Topographic <br />Survey for that portion of Warner Avenue from <br />westerly of Main Street to easterly of Oak Avenue. <br />Work included establishment of horizontal control <br />based on the centerline of Warner Avenue and the <br />establishmentofvertical control; tying outtheexisting <br />centerline monumentation prior to construction <br />and the preparation of Pre -Construction Corner <br />Records to be used during the construction phases <br />of the project by surveyors doing boundary work in <br />the area and for replacement of the monuments <br />that were destroyed during construction; setting <br />and control of aerial targets and photo ID points; <br />flight, photography, and compilation of the aerial <br />topographic mapping; cross-section survey at 25 <br />foot intervals and a detailed design survey of all <br />existing improvements from R/W line to R/W line; <br />and the preparation of a Topographic Map showing <br />the results of the work. <br />CLIENT CONTACT: <br />City of Santa Ana <br />Kenny Nguyen <br />20 Civic Center Drive - <br />Santa Ana, CA 92702 <br />714.647.5632 <br />L <br />CLIENT <br />CONTACT: <br />Oxnard CRFL <br />Partners <br />Carl Renezeder <br />64 Maxwell <br />Irvine, CA 92618 <br />949.719.9040 <br />COMPONENTS: <br />• Topographic Survey <br />• Boundaries <br />• Right -of -Way <br />HUITL-ZOLLARS <br />City of Santa On -Call Water Resources Engineering Services RFP No. 22-002 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.