Laserfiche WebLink
Huitt-Zollars prepared the design of approximately 6,000 of 12" HDPE highline for recycled water to assist the <br />Water district in the transportation of recycled water through the Santa Margarita Water District. Huiit-Zollars also <br />assisted the Santa Margarita Water district in the design and construction of a booster pump station to boost the <br />pressure of the recycled water line through multiple pressure zones. <br />Additionally, Huitt-Zollars worked <br />with Santa Margarita Water <br />District to prepare multiple details <br />to switch pipe materials and <br />underground the highline into a <br />casing and create a crossing of a <br />CLIENT CONTACT: <br />Santa Margarita Water District <br />Jamie Aguilar <br />• 26111 Antonio Parkway <br />Rancho Santa Margarita, CA <br />92688 <br />949.459.6400 <br />secondary arterial highway. The <br />design was completed to allow for the maintenance of the pipe without disrupting traffic on the highway. <br />Project <br />Image <br />Description <br />Reference <br />Smith Basin Scour <br />Huitt-Zollars has prepared final <br />Ryan Bouley <br />Assessment <br />hI plans, specifications, and estimates <br />Orange County Water <br />and Slope <br />for the Rehabilitation of Smith Basin <br />District <br />Rehabilitation- <br />downstream of Cannon Street and <br />187000 Ward Street <br />upstream of Villa Park Road in the <br />Fountain Valley, CA <br />City of Villa Park <br />City of Villa Park. <br />92708 <br />714.378.8207 <br />rbouley@ocwd.com <br />Oakmont Park <br />#-'' f Huitt-Zollars performed hydrologic, <br />City of Redlands <br />and Live Oak <br />hydraulic, geomorphic, and <br />- Municipal & <br />Canyon Creek <br />geotechnical investigations to <br />Engineering <br />Design Evaluation <br />characterize the conditions that <br />Department <br />and Repair <br />have led to the existing degradation <br />Goutam K. Dobey, PE <br />° of the creek bed and lateral erosion <br />909.798.7584 <br />City of Redlands <br />r iAo,,. <br />of the creek banks. Huitt-Zollars <br />gdobey@ <br />identified a preferred erosion control <br />cityofredlands.org <br />alternative based on constructability, <br />cost, environmental constraints, and <br />effectiveness. <br />South Arroyo <br />Huitt-Zollars is providing plans, <br />Natalie Mason, <br />Stormwater <br />specification, and estimates for <br />Project Manager Los <br />Mitigation <br />. storm drain, sewer, water quality, <br />N <br />Angeles Community <br />Improvements <br />- <br />- street, electrical, and landscaping <br />College District <br />improvements to meet State <br />(818) 367-7236 <br />LACCD, Sylmar, <br />Water Board, improve aging utility <br />Natalie.Mason@ <br />CA <br />infrastructure, and incorporate <br />build-laccd.org <br />American with Disability Act <br />requirements on campuses. <br />HMI 1 1 ZOLL� City of Santa On -Call Water Resources Engineering Services RFP No. 22-002 14 <br />