My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Approve Agreements for Agreements for On-Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
08/16/2022 Regular
>
Item 15 - Approve Agreements for Agreements for On-Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 9:41:59 AM
Creation date
12/18/2024 8:22:07 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
15
Date
8/16/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TAIT & Associates, Inc. <br />On -Call Water Resources Engineering Services <br />Hoover, Toll, Keppel Recycled Water Project <br />Glendale Water & Power, Glendale, CA <br />TAIT was contracted to provide design build services with JDC for the <br />recycled water project within the Glenwood residential neighborhood and <br />surrounding schools. The project was located in residential streets in an <br />area of Glendale which required our team to develop construction <br />documents that could accommodate traffic for three public schools and a <br />design that would work with many existing utilities. The design involved <br />the preparation of plans and specifications for approximately 5,890 linear <br />feet of 8-inch recycled water pipeline to bring recycled water to GWP's <br />customers in the area. In addition, the project provided enough capacity <br />for future extension and expansion. TAIT provided the design services <br />along with topographical survey of the neighborhood. Due to the <br />numerous existing utilities and mains within the project, detailed designs <br />were provided to ensure adequate clearance between all utilities. <br />f. References <br />City of Chino <br />Lupe Camacho <br />(909) 334-3406 <br />13220 Central Avenue, Chino, CA 91710 <br />Projects: Quadrant 111 Water Main Replacement <br />Reference Contact: <br />Kevin Runzer <br />141 N. Glendale Ave. <br />Glendale, CA 91206 <br />(818) 551-6910 <br />krunzer@glendaleca.gov <br />Client: <br />Glendale Water & Power <br />Construction Cost: <br />$3.1 million <br />Project Dates: <br />Design: 2018-2019 <br />Construction: 2019 <br />Project Team: <br />PIC/PM: Jacob Vandervis <br />PE: Samantha Wohlfarth <br />QA/QC: Todd Schmieder <br />Glendale Water & Power <br />Andy Cheung <br />(818) 551-6909 <br />141 N. Glendale Ave., Level 4, Glendale, CA 91206 <br />Projects: Hoover, Toll, Keppel Recycled Water Project, Kenneth and Ben Lomond Water Main Replacements <br />Project, Adams Hill Neighborhood Water Main Replacement Project, Beaudry Terrace Water Main <br />Replacement Project <br />Golden State Water Company <br />Conde Ventura, PE <br />(310) 436-6950 x102 <br />630 E. Foothill Boulevard, San Dimas, CA 91773 <br />Projects: Foothill District Water Main Replacements, Normandie Ave. Water Main Replacement <br />+` TAIT 1FX6E Page 1 10 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.