My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Approve Agreements for Agreements for On-Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
08/16/2022 Regular
>
Item 15 - Approve Agreements for Agreements for On-Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 9:41:59 AM
Creation date
12/18/2024 8:22:07 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
15
Date
8/16/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ff TAIT & Associates, Inc. <br />t On -Call Water Resources Engineering Services <br />As utility records are received, TAIT will update the project base map to ensure the plans have <br />the most recent alignment, size, type and depth of utilities currently present. <br />Utility Coordination <br />TAIT will coordinate with all present and affected utilities during the course of the design. All <br />potential conflicts with the improvements will be identified, and contact will be made with the <br />appropriate utility coordinator. Utility permits are not anticipated as part of this contract. <br />Utility Potholing <br />Tait will develop a potholing plan to identify locations in the field where field potholing may be <br />required to finalize the project's vertical alignments. Abased on a review of each project <br />segment Tait has identified potentially a total of 30 potholes that may be required. <br />After the approval of the preliminary water line pipe alignment and connection points, Tait will I <br />identify each pipe crossings using record drawings, field observations and field survey data. Of <br />the total number of pipe crossings identified, Tait will then identify the most critical crossings <br />that would require further investigation. The critical locations will then be used to develop a <br />Potholing Plan for the project. This Plan will then be submitted to the City for approval of the <br />Potholing Plan and the contract required number of potholes being proposed. <br />Tait's Fee Proposal provides a cost be pothole, the cost for a full day of potholing (approximately <br />five to six potholes based on the pothole locations and traffic conditions encountered) and the <br />total cost to do the 30 potholes initially identified by Tait in the development of our proposal <br />project understanding. Based on the final Number of Potholes the city will identify the proposed <br />approach to address the cost of conducting field services portion of the project's utility <br />potholing. <br />Utility Potholing - Field Services — OPTIONAL TASK <br />TAIT has obtained the services of Bess Testlab Inc. (BTL) in order to provide any required <br />potholing on this contract. In order to maximize the benefit of the potholing activities, TAIT <br />proposes to conduct all potholing services during the preparation of the 60% plans. Pothole <br />locations will be tied to existing features in the field in order to accurately represent the location <br />of the potholes on the plans. <br />The proposed potholing approach will use "spotholing" methods in order to minimize the time <br />of traffic impact and damage to the pavement structure. 1'x1' diameter holes will be cut in the <br />pavement soil will be excavated down to the depth of existing utility via use of a vacuum truck <br />and a high pressure hose. <br />Deliverables: <br />✓ Utility Notice & Responses, Utility Records, Utility Correspondence, Dig Alert list of Utilities <br />✓ Utility Potholing Base map <br />✓ Utility Pothole Report <br />`TAITn41FX6E Page 1 12 <br />y <br />
The URL can be used to link to this page
Your browser does not support the video tag.