My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Approve Agreements for Agreements for On-Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
08/16/2022 Regular
>
Item 15 - Approve Agreements for Agreements for On-Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 9:41:59 AM
Creation date
12/18/2024 8:22:07 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
15
Date
8/16/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TAIT & Associates, Inc. <br />On -Call Water Resources Engineering Services <br />schools. The project was located in the residential streets in an area of Glendale which required our <br />team to develop construction documents that could accommodate traffic while working and a design <br />that would work with many existing utilities. <br />Kenneth and Ben Lomond Water Main Replacement Projects, Glendale Water & Power, Project <br />Manager/Engineer, 2015-2016 <br />TAIT was contracted to provide design build services with JDC for the Kenneth and Ben Lomond <br />neighborhoods water main replacement projects. The project was located in residential streets in an <br />area of Glendale which required our team to develop construction documents that could accommodate <br />traffic while working in residential streets and a design that would work with many existing utilities. <br />Various Projects - Bank of America ADA Upgrades, Southern CA, Project Manager 2018-2020 <br />TAIT was contracted to provide civil engineering and surveying services in upgrading the ADA <br />components of various Bank of America projects across Southern California. TAIT has completed a total <br />of 36 projects to date. The upgrades include ADA parking spaces, path of travels, ramp improvements, <br />and all necessary components to upgrades the existing sites to the latest local, CBC and IBC codes. <br />Home Depot Pasadena — Project Manager - Pasadena, CA, 2018-2020 <br />TAIT was contracted to provide civil engineering and surveying services at a 12.5 acre site in Pasadena, <br />CA. The site was an existing office building and warehouse development. The project included the <br />redevelopment of the existing buildings, site grading, paving and drainage improvements, wet utility <br />plans, and street improvements. Services included the preparation of a Hydrology Report and <br />Stormwater Management Report for the development. Storm water management improvements <br />included the incorporation of detention basins and drywells, throughout the site to treat storm water <br />runoff. Ms. Wohlfarth has provided construction engineering support services during construction to <br />address City and owner request changes, as well as contractor's questions. <br />Monterey Park Marketplace Site Development, Monterey Park Retail Partners, LLC/City of Monterey <br />Park, Project Engineer/Project Coordinator, 2015-Present <br />TAIT was awarded a contract with the developer, Monterey Park Retail Partners, LLC for the design of a <br />41 acre retail development within the City of Monterey Park and the City of Montebello. The design of <br />the development includes slope stabilization, retaining wall design, street improvement design, utility <br />installation, overall site development, and over 400,000 cubic yards of dirt removal and regrading. The <br />project involves three geotechnical analysis. The geotechnical analysis included recommendations for <br />the design on and near the landfill; for the slope stabilization throughout the site; and for the overall site <br />development and construction. The project utilized detailed retaining wall designs and in some areas, <br />pile designs. These retaining walls and pile designs were specially designed near SCE facilities and <br />towers. Unique construction equipment has been detailed out and coordinated for this construction. <br />TAIT ,.., Appendix 1 28 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.