Laserfiche WebLink
Education <br />B.S. -- Civil Engineering <br />Valparaiso University <br />Valparaiso, IN, 2012 <br />Year of TAIT Team <br />Enlistment <br />2012 <br />Total Experience <br />10 <br />Certifications <br />Professional Engineer <br />California No. 86126 <br />TAIT & Associates, Inc. <br />On -Call Water Resources Engineering Services <br />Samantha (McGee) Wohlfarth, P.E. <br />PROFESSIONAL ENGINEER -WATER <br />Ms. Wohlfarth has professional experience that includes the preparation of <br />grading plans, water main replacement plans, storm drain plans and drainage <br />reports, sewer plans, cost estimates and storm water management reports for <br />public and private developments throughout Southern California, Western <br />Washington, and North Dakota. Her project experience also includes the <br />preparation of storm water quality reports such as SWPPP, WQMP, SUSMP and <br />LID as mandated by the state and local municipalities. Ms. Wohlfarth has <br />technical knowledge with multiple software programs including AutoCAD 2014, <br />Civil 3D, Land Desktop, Microstation, GeoPak, WWHM2012, RetainPro, and <br />additional specialty programs. <br />Pipeline Management Program, FY2019-2020 Phase 1 Project <br />Glendale Water & Power, Project Manager/Engineer, 2019-2020 <br />TAIT was contracted to provide design build services with JDC for various <br />neighborhood water main replacement projects. The project required the <br />replacement of approximately 11,535LF of existing ACP water pipe within 8 <br />local streets, while working in residential streets and incorporating a design that <br />would work with many existing utilities. The process included obtaining DDW <br />approvals for many of the segments. <br />Pipeline Management Program, FY2018-2019 Phase 1 Project <br />Glendale Water & Power, Project Manager/Engineer, 2018-2019 <br />TAIT was contracted to provide design build services with JDC for the Pipeline <br />Management Program, FY2018-2019 Phase 1 water main replacement project. <br />The project was located in residential streets in various areas of Glendale which <br />required our team to develop construction documents that could accommodate <br />traffic while working in residential streets and a design that would work with <br />many existing utilities. <br />Chino Quadrant III A, B, and C Water Line Replacement Project, City of Chino <br />Project, Project Manager/Engineer, 2017-2018 <br />This City project required the replacement of approximately 8000LF of existing <br />6-inch ACP water pipe with new 8-inch PVC water pipe within13 local streets for <br />the City. The process included obtaining DDW approvals for 8 of the 14 <br />segments. <br />Hoover, Toll, Keppel Recycled Water Project, Glendale Water & Power, Project <br />Manager/Engineer, 2016-2017 <br />TAIT was contracted to provide design build services with JDC for the recycled <br />water project within the Glenwood residential neighborhood and surrounding <br />`TAIT <br />Appendix 1 27 <br />