My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 19 - Cabrillo Crossing Density Bonus Agreement, 1814 & 1818 E. First Street
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
08/16/2022 Regular
>
Item 19 - Cabrillo Crossing Density Bonus Agreement, 1814 & 1818 E. First Street
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 9:50:53 AM
Creation date
12/18/2024 9:31:35 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
19
Date
8/16/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
484
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Mitigation Monitoring and Reporting Program <br />Mitigation Implementing <br />Measure No. Mitigation Measure Monitoring Party Party Mitigation Timing <br />MM-OZ 4.2-10 The developer shall require by contract specifications that Planning and Project Prior to <br />construction activities that affect traffic flow on the arterial system Building applicant construction <br />be scheduled to off-peak hours (10:00 A.M. to 4:00 P.M.). Contract Agency/Public <br />specifications shall be included in the proposed project Works <br />construction documents, which shall be approved by the City of <br />Santa Ana Planning and Building Agency staff. <br />MM-OZ 4.2-11 The developer shall require by contract specifications that <br />Planning and Project Prior to <br />dedicated on -site and off -site left -turn lanes on truck hauling <br />Building applicant construction <br />routes be utilized for movement of construction trucks and <br />Agency/Public <br />equipment on site and off site to the extent feasible during <br />Works <br />construction activities. Contract specifications shall be included in <br />the proposed project construction documents, which shall be <br />approved by the City of Santa Ana Planning and Building Agency <br />staff. <br />MM-OZ 4.2-12 Upon issuance of building or grading permits, whichever is issued Planning and Project Upon issuance of <br />earliest, notification shall be mailed to owners and occupants of all Building Agency applicant building or grading <br />developed land uses within 1/4 mile of the Overlay Zone and the permits <br />individual projects within the Overlay Zone providing a schedule <br />for major construction activities that will occur through the <br />duration of the construction period. In addition, the notification <br />will include the identification and contact number for a community <br />liaison and designated construction manager that would be <br />available on site to monitor construction activities. The <br />construction manager shall be responsible for complying with all <br />project requirements related to PM10 generation. The construction <br />manager will be located at the on -site construction office during <br />construction hours for the duration of all construction activities. <br />Contract information for the community liaison and construction <br />manager will be located at the construction office, City Hall, the <br />police department, and a sign on site. <br />Metro East Mixed -Use Overlay District Expansion and Elan Development Projects <br />August 2018 <br />ICF00019.18 <br />Apx-231 <br />
The URL can be used to link to this page
Your browser does not support the video tag.