My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
01/21/2025
>
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2025 4:50:22 PM
Creation date
1/21/2025 3:12:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
18
Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: 25-6030 <br />TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br />AVENUE <br />AGENCY utility manhole frames and covers shall be adjusted to grade with PCC collar in <br />accordance with the respective Standard Plans. <br />The Contractor shall cooperate with the owners of any frames and covers and shall cover <br />and completely protect said frames and covers with heavy plastic or other suitable material. <br />1.19 PULVERIZE & CEMENT -TREAT EXISTING ASPHALT CONCRETE, BASE, AND <br />SUBGRADE.....................................................................................................NOT USED <br />1.20 REMOVE EXCESS PULVERIZED MATERIAL ..........................................NOT USED <br />1.21 COLD IN -PLACE RECYCLING (CIR) / COLD CENTRAL PLANT RECYCLING <br />CCPR..............................................................................................................NOT USED <br />1.22 COLD IN -PLACE RECYCLING EXPANDED ASPHALT MIX (CIREAM) NOT USED <br />1.23 ASPHALT -RUBBER CAPE SEAL <br />This Section shall conform to Section 600 (chiefly, 600-2.7) of the Standard Specifications <br />and these Special Provisions. <br />General <br />The construction sequence of asphalt -rubber cape seal shall be as follows: <br />a) 3/4" asphalt -concrete leveling course shall be constructed; <br />b) Asphalt -rubber shall be applied; <br />c) Cover aggregate shall be placed and rolled and loose material removed; and <br />d) Emulsion -aggregate slurry Type II shall be applied no sooner than 48-hours and no <br />later than 7 days after cover aggregate is applied. <br />Certified volume or weight slips shall be delivered to the Engineer for all materials <br />supplied. <br />Pavement Preparation - The pavement shall be cleaned with a power broom. <br />Asphalt -Rubber <br />Asphalt -rubber shall be Type A or B per Section 600-2. The Contractor shall submit a <br />manufacturer's Certificate of Compliance and test reports for the asphalt and rubber. <br />.O <br />
The URL can be used to link to this page
Your browser does not support the video tag.