My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
01/21/2025
>
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2025 4:50:22 PM
Creation date
1/21/2025 3:12:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
18
Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: 25-6030 <br />TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br />AVENUE <br />Asphalt <br />The Asphalt for Types A and B shall conform to Subsections 600-2.2.4 and 600-2.2.5, <br />respectively, and shall be viscosity grade AR-4000. <br />Asphalt -rubber shall be placed in accordance with Section 600-2.7.4. <br />Application shall be stopped before the distribution tank is empty to assure application <br />does not run light. <br />All reasonable precautions shall be taken to avoid skips at joints and to protect the surfaces <br />of adjacent structures from being spattered or marred. Correction of any such defects shall <br />be made at no expense to the AGENCY. <br />Hot joints shall be made utilizing a squeegee man between the boot truck and the chip <br />spreader to spread out or rake off overlaps or excess applications of the asphalt -rubber. <br />The longitudinal joint between adjacent applications of screenings shall coincide with the <br />line between designated traffic lanes. <br />Just before spreading asphalt -rubber, Contractor shall provide a measure of viscosity with <br />a Haake hand-held viscosity meter, if requested by the Engineer. Viscosity shall be as <br />specified in the standard specifications. <br />The distributor shall also include a tachometer, pressure gauge, volume measuring device <br />and a thermometer. <br />When a job delay occurs after full reaction, the asphalt -rubber may be allowed to cool. Just <br />prior to restart of application, the material shall be reheated slowly to a temperature not <br />less than 375 degrees F nor more than 400 degrees F. <br />Cover Aggregate <br />This section shall conform with Section 600-2.7.5. <br />If the aggregate chips bounce or roll after striking the asphalt -rubber, the spreader shall be <br />operated at reduced speed. <br />41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.