My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
01/21/2025
>
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2025 4:50:22 PM
Creation date
1/21/2025 3:12:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
18
Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: 25-6030 <br />TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br />AVENUE <br />All material removed for pole foundations shall become the property of the Contractor and <br />shall be disposed of outside the site of work by and at the expense of the Contractor. <br />The height of foundations shall be 18" above grade for Type P cabinet and 4" above grade <br />for Type 332 cabinet or Type ATCC cabinet. <br />Foundation concrete shall be vibrated to eliminate air pockets. <br />Contractor shall define exact location of all utilities in the vicinity of the new foundations, <br />by hand digging if necessary. After all utilities are established, Contractor shall contact <br />the Engineer for authorization of specific foundation location. Foundations shall be hand - <br />dug until clear of obstructions. <br />Foundations for traffic signal and luminaire mast arm poles shall be constructed to ensure <br />that the traffic signal or luminaire mast arm is perpendicular (with a tolerance of 2° from <br />perpendicular) to the adjacent tangent curb face or to the alignment as shown on the plans. <br />Foundations that do not provide the proper alignment of the traffic signal or luminaire mast <br />arm (as specified above) shall be completely removed and reconstructed at the Contractor's <br />expense. The Contractor shall verify the proper alignment of the traffic signal pole or <br />electrolier foundation anchor bolts prior to placement of Portland cement concrete. <br />As included in the contract documents, the Contractor shall locate and install foundations <br />as directed by the Engineer. No foundation shall be located within five feet of a water <br />meter or fire hydrant. <br />The top two inches of the concrete foundation shall be grouted after they are in position. <br />The exposed portions of the foundations shall be formed to present a neat appearance. <br />Replace pavement or sidewalk in kind to match existing material, color and pattern, from <br />score mark to score mark, after foundations have been installed. <br />4.14 STANDARDS, STEEL PEDESTALS AND POSTS <br />Standards, steel pedestals and posts shall conform to the provisions in Section 56-3, <br />"Standards, Poles, Pedestals, and Posts," of the Caltrans Standard Specifications and these <br />Special Provisions. <br />The Engineer shall approve the location of all standards, steel pedestals, and posts in the <br />field, prior to installation. <br />Contractor shall furnish all new nuts, bolts, washers, foundation anchors, pole caps, hand <br />hole covers, and other hardware, as required to provide the intended installation, for all <br />Contractor -furnished or relocated equipment. Nuts, bolts, washers, foundation anchors, <br />pole caps, hand hole covers and other hardware shall comply with the Caltrans Standard <br />Specifications, Caltrans Standard Plans, these Special Provisions, and the Plans. <br />63 <br />
The URL can be used to link to this page
Your browser does not support the video tag.