My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
01/21/2025
>
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2025 4:50:22 PM
Creation date
1/21/2025 3:12:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
18
Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: 25-6030 <br />TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br />AVENUE <br />1. Quality Assurance Provisions <br />Documentation of factory test results shall be provided to the Engineer for approval <br />prior to shipping. <br />The attenuation of 100 percent of the fibers shall be tested by the Manufacturer and <br />certified as satisfying the requirements of this specification. A copy of the test <br />results for each fiber in the cable shall be provided with each reel of cable. <br />Attention is directed to "Fiber Optic Testing," elsewhere in these special provisions. <br />The Contractor shall furnish a Manufacturer's certification that the fiber optic cable <br />materials proposed for use on this project will meet all applicable special <br />provisions. <br />The material shall not be installed in the field prior to the Engineer's approval. <br />2. Installation <br />Installation procedures shall conform to the procedures specified by the <br />Manufacturer of the specific cable being installed. <br />Prior to installing the optical fiber cable, the Contractor shall test the cable on the <br />shipping reel. The Contractor shall submit the manufacturer's recommended <br />procedures for pulling the fiber optic cable to the Engineer for review and approval <br />at least 20 working days prior to installing cables. Mechanical aids may be used to <br />assist cable installation. A tension measuring device or break away swivel shall be <br />placed between the end of the cable grip and the pull rope, to ensure that the tension <br />does not exceed 80 percent of recommended tension or 2225 N, whichever is less. <br />The cable grips for installing fiber optic cable shall have a ball bearing swivel to <br />prevent the cable from twisting during installation. <br />The fiber optic cable shall be installed using a cable pulling lubricant recommended <br />by the fiber optic cable and/ the innerduct manufacturer and a non-abrasive pull <br />tape conforming to the provisions described under "Conduit" elsewhere in these <br />special provisions. Contractor's personnel shall be stationed at each splice vault <br />and pull box through which the cable is to be pulled to lubricate and prevent kinking <br />or other damage. <br />During cable installation, the bend radius shall be maintained at a minimum of 20 <br />times the outside diameter of the cable. <br />Splices shall only be allowed at cable transitions, such as, changes in the size of <br />cables or at entry points for drop -cables. Splice closures shall be required at every <br />junction point and at every device being serviced by the fiber optic cable as <br />indicated on the fiber optic conductor schedules. At each splice closure, all useable <br />fibers in the cable shall be continuously spliced as indicated on the plans. The end- <br />/: <br />
The URL can be used to link to this page
Your browser does not support the video tag.