My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
01/21/2025
>
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2025 4:50:22 PM
Creation date
1/21/2025 3:12:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
18
Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: 25-6030 <br />TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br />AVENUE <br />f. System Verification at Completion <br />a. OTDR Testing <br />Once the passive cabling system has been installed and is ready for <br />activation, 100 percent of the fiber links shall be tested with the OTDR for <br />attenuation. Test results shall be recorded, dated, compared and filed with <br />previous copies. Copies of traces and test results shall be submitted to the <br />Engineer for approval. If the OTDR test results are unsatisfactory the link <br />shall be replaced at the Contractor's expense. The new link shall then be <br />tested to demonstrate acceptability. Copies of the test results shall be <br />submitted to the Engineer for approval. <br />b. Test Failures <br />If during any of these system verification tests, the results prove to be <br />unsatisfactory, the fiber optic cable and or defective splice enclosures will <br />not be accepted. The unsatisfactory components shall be replaced at the <br />Contractor's expense. The new segment of cable shall undergo the same <br />testing procedure to determine acceptability. Copies of the test results shall <br />be submitted to the Engineer for approval. The removal and replacement <br />of a segment of cable shall be interpreted as the removal and replacement <br />of a single contiguous length of cable connecting two splices, two <br />connectors, or a splice and a connector. The removal of only the small <br />section containing the failure and therefore introducing new unplanned <br />splices will not be allowed. <br />4.33 CLOSED CIRCUIT TELEVISION (CCTV) SYSTEM <br />When CCTV system is required, the Contractor shall furnish and install Axis Q6315-LE <br />PTZ Network Camera as shown on the plan. The CCTV system shall consist of <br />camera/pan-tilt assembly, mounting, cables, conductors and wires, control software and <br />video management system licensing. <br />1. Mounting <br />The Contractor shall mount the integrated camera/position unit on existing traffic signal <br />pole as shown on plans and per manufacturer's recommendation. The Contractor shall <br />verify the mounting requirements of the integrated camera/position unit, and the <br />suitability of the approach depicted in these plans. The Contractor may request <br />approval for alternate mounting details by submitting a shop drawing signed by a <br />registered Engineer. <br />2. Video Cable <br />The Contractor shall furnish and install manufacturer recommended Outdoor CAT-6 <br />Ethernet cable with IP66-rated connectors and incidental hardware from the camera to <br />FIX <br />
The URL can be used to link to this page
Your browser does not support the video tag.