My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
01/21/2025
>
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2025 4:50:22 PM
Creation date
1/21/2025 3:12:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
18
Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: 25-6030 <br />TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br />AVENUE <br />Joints in the concrete pavement shall be constructed as described in Section 302-6.5 of the <br />Standard Specifications except as modified herein. Sawing of the joints shall begin as soon <br />as the concrete has hardened sufficiently to permit sawing without excessive raveling, <br />usually 4 to 24 hours per Engineer's directions. If necessary, the sawing operations shall <br />be carried on both day and night, regardless of weather conditions. <br />All joints shall be sawed before uncontrolled shrinkage cracking occurs. A standby saw <br />shall be available in the event of breakdown. All weakened plane joints shall be saw cut <br />to a depth equal to one fourth of the pavement thickness. Longitudinal joint spacing shall <br />be at 10' minimum and 15' maximum on either side of centerline joint. Transverse joint <br />spacing shall be at 10' minimum and 15' maximum for pavement, curb and gutter. <br />Longitudinal joints shall be aligned such that they will cross manholes and water valves at <br />centerline if possible. Transverse construction joints within I'shall cross all manholes and <br />water valves. Provide a weakened plane joint around the perimeter of all utility vaults. <br />The Cleanness Value requirement of Section 200-1.4 shall be replaced with the following: <br />Tests <br />Cleanness Value <br />Individual Test <br />Moving Average <br />Test Method <br />California 227 <br />Requirements <br />70 min <br />75 min <br />The Sand Equivalent requirement of Section 200-1.5.3 shall be replaced with the <br />following: <br />Tests <br />Sand Equivalent <br />Individual Test <br />Moving Average <br />Test Method <br />California 227 <br />Requirements <br />70 min <br />75 min <br />Evaluation of Sand Equivalent and Cleanness Value results shall conform to the provisions <br />of Standard Specifications Subsection 400-1.4. <br />Concrete shall be high early strength concrete, treated in accordance with section <br />201-1 to obtain (7) day compressive strength in (3) days. <br />Traverse joints shall match those of the adjacent pavement. The concrete pavement shall <br />be immediately barricaded upon its installation and no vehicular traffic will be permitted <br />until and after 3-days of placement and with the approval of the Engineer. <br />91 <br />
The URL can be used to link to this page
Your browser does not support the video tag.