CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: 25-6030 <br />TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br />AVENUE <br />The Contractor shall perform leakage and pressure tests of the bypass pumping discharge <br />piping suing clean water prior to the actual operation. The Water Resources Division shall <br />be given 24 hours notice prior to testing. <br />The Contractor shall be required to flow monitor for a two week period to assist in sizing <br />the pumps necessary for the sewer work and shall be considered included as part of the <br />work. The Contractor shall prepare, with the vendor, a flow monitoring map for key <br />manholes that will provide adequate data for the work subject to review and approval from <br />the Water Resources Division. Flow monitoring shall capture accurate instantaneous <br />depth, velocity and flow data in 15-minute increments or less, or as otherwise approved by <br />the Water Resources Division. The Contractor shall prepare with the vendor a specific, <br />detailed description of the proposed pumping system and submit it and the vendor's <br />references to the City. The Contractor shall submit to the City detailed descriptions <br />outlining all provisions and precautions to be taken by the Contractor regarding handling <br />of existing sewage flows. The submittal must be specific and complete, including such <br />items as schedules, capacities of equipment, materials, and all other incidental protection <br />of the access and bypass pumping locations from damage due to the discharge flows. <br />The submittal shall include but not be limited to the following: <br />1. Sewer plugging method and types of plug. <br />2. Number, size, material, location and method of installation of suction piping. <br />3. Number, size, material, location and method of installation of discharge piping. <br />4. Bypass pump sizes, capacity, number of each size to be on -site and power <br />requirements. <br />5. Calculations of static lift, friction losses, and flow velocity (pump curves showing <br />pump operating range shall be submitted). <br />6. Standby power generator size. <br />7. Method of protecting discharge manholes or structures from erosion and damage. <br />8. Thrust block sizes and restraining lengths of pipes and locations (if necessary). <br />9. Method of noise control for each pump and/or generator. <br />10. Any temporary pipe supports and anchoring requirements. <br />11. Design plans and computations for access to bypass pumping locations indicated <br />on the drawings. <br />12. Calculations for selection of bypass pumping pipe size. <br />•e <br />