My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
01/21/2025
>
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2025 4:50:22 PM
Creation date
1/21/2025 3:12:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
18
Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: 25-6030 <br />TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br />AVENUE <br />The Contractor shall perform leakage and pressure tests of the bypass pumping discharge <br />piping suing clean water prior to the actual operation. The Water Resources Division shall <br />be given 24 hours notice prior to testing. <br />The Contractor shall be required to flow monitor for a two week period to assist in sizing <br />the pumps necessary for the sewer work and shall be considered included as part of the <br />work. The Contractor shall prepare, with the vendor, a flow monitoring map for key <br />manholes that will provide adequate data for the work subject to review and approval from <br />the Water Resources Division. Flow monitoring shall capture accurate instantaneous <br />depth, velocity and flow data in 15-minute increments or less, or as otherwise approved by <br />the Water Resources Division. The Contractor shall prepare with the vendor a specific, <br />detailed description of the proposed pumping system and submit it and the vendor's <br />references to the City. The Contractor shall submit to the City detailed descriptions <br />outlining all provisions and precautions to be taken by the Contractor regarding handling <br />of existing sewage flows. The submittal must be specific and complete, including such <br />items as schedules, capacities of equipment, materials, and all other incidental protection <br />of the access and bypass pumping locations from damage due to the discharge flows. <br />The submittal shall include but not be limited to the following: <br />1. Sewer plugging method and types of plug. <br />2. Number, size, material, location and method of installation of suction piping. <br />3. Number, size, material, location and method of installation of discharge piping. <br />4. Bypass pump sizes, capacity, number of each size to be on -site and power <br />requirements. <br />5. Calculations of static lift, friction losses, and flow velocity (pump curves showing <br />pump operating range shall be submitted). <br />6. Standby power generator size. <br />7. Method of protecting discharge manholes or structures from erosion and damage. <br />8. Thrust block sizes and restraining lengths of pipes and locations (if necessary). <br />9. Method of noise control for each pump and/or generator. <br />10. Any temporary pipe supports and anchoring requirements. <br />11. Design plans and computations for access to bypass pumping locations indicated <br />on the drawings. <br />12. Calculations for selection of bypass pumping pipe size. <br />•e <br />
The URL can be used to link to this page
Your browser does not support the video tag.