My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
01/21/2025
>
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2025 4:50:22 PM
Creation date
1/21/2025 3:12:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
18
Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: 25-6030 <br />TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br />AVENUE <br />13. Schedule for installation of and maintenance of bypass pumping piping. <br />14. Submit a sewer overflow emergency response plan. The plan will dictate backup <br />pumping plans, spill containment procedures, spill recovery procedures and <br />emergency call out phone numbers. <br />Provision shall be made by the Contractor for the collection of sewage from cutoff lateral <br />sewers. Lateral sewers shall be reconnected to the main before the termination of every <br />working day. <br />The text of Subsection 306-1.6 of the Standard Specifications is hereby deleted and <br />replaced with the following: <br />Pipe shall be measured along the longitudinal axis between the ends as laid and <br />shall include the actual pipe in place. <br />Following placement and compaction of backfill and prior to the placement of permanent <br />pavement, all newly constructed PVC sewer mains shall be cleaned and tested for <br />deflection and ovality by either using: a rigid mandrel for smaller diameter pipe; or laser <br />profile technology and/or with an electronic deflect-o-meter for larger diameter piping. <br />The deflection and or ovality shall not exceed (5%) of the inside diameter of the pipe. If <br />the pipe exceeds this tolerance, it is the responsibility of the contractor to replace and re- <br />test the newly constructed pipe for deflection and ovality. <br />If the pipe is to be tested by mandrel, the rigid mandrel shall have a circular cross section <br />having a diameter of at least 95 percent of the specified inside pipe diameter and shall be <br />pulled through the pipe by hand. The minimum length of the circular portion of the <br />mandrel shall be equal to the nominal diameter of the pipe. A 1/4-inch diameter nylon line <br />shall be pulled from manhole to manhole and shall be left for use in conducting the CCTV <br />inspection. Obstructions encountered by the mandrel shall be repaired and the pipeline <br />section shall be retested. <br />All labor and equipment necessary to conduct these tests shall be furnished by the <br />contractor. <br />The contractor shall submit all laser profile documents to the Engineer for review and <br />approval no later than (10) days after the test. <br />6.11 NEW MANHOLE STRUCTURES <br />Construction of new concrete manhole structures shall be done in accordance with City of <br />Santa Ana Standard No. 1201, details as shown on the plans, the applicable provisions of <br />Sections 201, 303, and 306 of the Standard Specifications and these Special Provisions. <br />This work shall also include the removal and/or modification of any interfering portions of <br />97 <br />
The URL can be used to link to this page
Your browser does not support the video tag.