My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
01/21/2025
>
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2025 4:50:22 PM
Creation date
1/21/2025 3:12:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
18
Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: 25-6030 <br />TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br />AVENUE <br />Pipe shall be measured along the longitudinal axis between the ends as laid and <br />shall include the actual pipe in place. <br />Joining of HDPE pipe shall be performed by thermal butt -fusion in accordance with the <br />manufacturer's recommendations. Internal weld beads formed by the thermal butt -fusion <br />method shall be removed on the bottom 120 degrees of the pipe, minimum. The bead shall <br />be removed to the pipe's surface, but under no circumstances shall it be below it. The joint <br />must sufficiently cool to ambient temperature before the bead is removed. <br />Butt -fused joint strength shall be equal to or greater than the strength of the pipe. <br />Threaded or solvent -cement joints and connections shall NOT be permitted. <br />A "Y" Branch fitting shall be installed on the sewer main at each lateral connection per <br />City of Santa Ana Standard Plan No. 1204A. In the case where the lateral is to be connected <br />to a sewer main that has been lined, a "Y" Saddle fitting shall be installed. The connection <br />shall conform to the size and shape of the inside diameter of the new connection. Service <br />connection openings shall be free from rough edges or protrusions. CORING OF NEW <br />SEWER MAIN TO ACCOMMODATE LATERAL CONNECTION SHALL NOT <br />BE ALLOWED. <br />At all locations where more than one (1) lateral serves a single parcel, Contractor shall <br />expose existing lateral connection to the existing sewer main and verify that the lateral is <br />active by CCTV inspection. In addition, the Contractor shall insert a push camera with <br />sounder/locator up the lateral from the main (insertion pit) to mark and locate the point of <br />connection at the property line. If CCTV investigation is inconclusive, lateral shall be <br />treated as active and shall be constructed per plan. If lateral is determined to be dead, lateral <br />shall be plugged and abandoned in place. <br />The Contractor shall connect to the new sewer main and to the existing sewer lateral pipe <br />at property line. <br />During construction, the Contractor shall make provisions for the collection of sewage <br />from cutoff laterals. All sewer laterals shall be reconnected to the main before the <br />termination of each working day. <br />The Contractor shall submit all material information for sewer lateral cleanout connections <br />and appurtenances prior to commencing work. The Engineer shall review and upon <br />approval notify the Contractor by a memorandum. Non -approved materials shall not be <br />used. <br />New submittals shall be required for material substitutions. The Engineer shall review and <br />upon approval notify the Contractor by a memorandum. <br />All fittings shall be pressure rated and classified the same as adjoining pipe. The inside <br />diameter shall match inside diameter of adjoining pipe and shall be designed for pipe <br />bursting or pipe jacking applications. <br />102 <br />
The URL can be used to link to this page
Your browser does not support the video tag.