Laserfiche WebLink
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: 25-6030 <br />TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br />AVENUE <br />New submittals shall be required for material substitutions. The Engineer shall review and <br />upon approval notify the Contractor by a memorandum. <br />During construction, the Contractor shall make provisions for the collection of sewage <br />from cutoff laterals. All sewer laterals shall be reconnected to the main before the <br />termination of each working day. <br />The curb and gutter shall be protected in place. If the Contractor damages curb, gutter, it <br />shall be removed and replaced to match existing in accordance with City of Santa Ana <br />Standard Plan No. 1101. This work shall also include removal and replacement of PCC <br />sidewalk, driveway panels and landscaping to facilitate construction of sewer laterals. PCC <br />sidewalk and driveway approach panels shall be replaced to match existing in accordance <br />with the City of Santa Ana Standard Plan No. 1104 and 1112. Sidewalk replacement shall <br />be from score line to score line, unless the sidewalk panels exceed four feet in length. At <br />no time, shall a sidewalk panel floater be less than four feet from the nearest score line. <br />Landscaping shall be replaced in -kind. <br />6.17 CONNECT SEWER LATERALS <br />This work shall include reconnecting existing sewer lateral to the new sewer main. This <br />work shall include locating all existing laterals and pipe connection points, furnishing and <br />installing new pipe and connections to the new main in accordance with City of Santa Ana <br />Standard Plan Nos. 1204 and 1204A, replacement of street surface over trench as shown <br />on drawings. <br />At all locations where more than one (1) lateral serves a single parcel, Contractor shall <br />expose existing lateral connection to the existing sewer main and verify that the lateral is <br />active by CCTV inspection. In addition, the Contractor shall insert a push camera with <br />sounder/locator up the lateral from the main (insertion pit) to mark and locate the point of <br />connection at the property line. If CCTV investigation is inconclusive, lateral shall be <br />treated as active and shall be constructed per plan. If lateral is determined to be dead, lateral <br />shall be plugged and abandoned in place. <br />During construction, the Contractor shall make provisions for the collection of sewage <br />from cutoff laterals. All sewer laterals shall be reconnected to the main before the <br />termination of each working day. <br />6.18 CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER MAIN AND <br />T,ATF,RATN <br />Following installation of pipe, CCTV inspection shall be performed on all newly <br />constructed sewer mains and sewer laterals. This work shall also include cleaning of sewer <br />main prior to videoing in accordance with section 500-1.1.4 of the Standard Specifications. <br />The scope of work includes the cleaning and videoing by means of remote CCTV. If a <br />blockage in the pipe hampers the CCTV work, then the Contractor shall attempt to <br />complete the CCTV work by televising from the opposite manhole (upstream or <br />105 <br />