Laserfiche WebLink
CITY OF SANTA ANA <br />DEFINITION OF BID ITEMS <br />PROJECT NO.: 25-6030 <br />TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br />AVENUE <br />all materials, labor, equipment, tools, and incidentals and no additional compensation will be <br />allowed therefore. <br />Bid Item No. 11 - Fiber Optic Splice Enclosure <br />This work consists of installing a Corning Cable Systems Fiber Optic Splice Closure including <br />splice trays, pigtails, connectors, and labeling as indicated on plans. <br />Payment for the installation of Fiber Optic Splice Enclosure, shall be at contract unit price bid <br />per Each Item listed in the Bid Proposal and shall be considered full compensation for furnishing <br />all materials, labor, equipment, tools, and incidentals and no additional compensation will be <br />allowed therefore. <br />Bid Item No. 12 - Signing and Striping <br />Removal of all traffic striping and pavement markings shall be by wet blasting. All traffic striping <br />may be removed by wet sandblasting with the Engineer's approval, shall be completely removed <br />to the satisfaction of the Engineer. Any damaged pavement due to pavement removal <br />(Grinding), SHALL be repair to maintain a smooth and uniform surface. All removal areas <br />shall be slurry sealed by rubberized slurry seal. Slurry seal shall cover from lane line to lane <br />line unless directed otherwise by the engineer. <br />Payment for Signing and Striping shall be at the contract unit price bid per Lump Sum listed in the <br />Bid Proposal, and shall include full compensation for furnishing all labor, materials, tools, equipment, <br />disposal of all removed materials and incidentals as required, and no additional compensation will be <br />allowed therefore. <br />Bid Item No. 13 - Pothole Pole Location for Utility Conflicts <br />The work under this item consists of potholing for traffic signal equipment location as shown on <br />the plans. One pothole bid item includes all utilities found in the pothole, not per utility. <br />The work under this item consists of mobilizing the Contractor's workforce, labor, equipment, <br />and materials; providing bonds, insurance, and license; demobilizing; and performing final <br />cleanup. All work shall be performed to the satisfaction of the Engineer. <br />Payment for Pothole Pole Location for Utility Conflicts shall be considered full compensation <br />for furnishing all labor, materials, tools, equipment, removals, paving, landscape repair, irrigation <br />repair, root shaving, sidewalk restoration, pothole and trench backfill per City Std. Plan 1150, <br />permanent asphalt replacement, permanent PCC replacement and appurtenances for all related <br />items of work necessary for the installation. No additional compensation will be allowed therefore. <br />Bid Item No. 14 - Pothole Utilities Not Shown on Plan <br />Payment for Pothole Utilities Not Shown on Plan, shall be at contract unit price bid per Each <br />Item listed in the Bid Proposal and shall be considered full compensation for furnishing all labor, <br />materials, tools, equipment, removals, paving, landscape repair, sidewalk restoration, pothole and <br />Now <br />