My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
01/21/2025
>
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2025 4:50:22 PM
Creation date
1/21/2025 3:12:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
18
Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />DEFINITION OF BID ITEMS <br />PROJECT NO.: 25-6030 <br />TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br />AVENUE <br />Bid Item No. 26 - CCTV Inspection of Existing Sewer Main and Laterals (Pre and Post <br />Construction) <br />The work under this item consists of performing a pre -construction and a post -construction CCTV <br />inspection of the existing sewer main and laterals. <br />Payment for this item shall be at the contract unit price bid per Lump Sum as listed in the Bid <br />Proposal, and shall include full compensation for doing all work, including furnishing all materials, <br />labor, equipment, tools, removals, disposal of materials and incidentals as required and no <br />additional compensation will be allowed therefore. <br />Bid Item No. 27 - Temporary Above Ground Sewer Line with Backup Pumps and Tractor <br />Truck <br />Payment for this item shall be at the contract unit price bid per Lump Sum as listed in the Bid <br />Proposal, and shall include full compensation for doing all work, including furnishing all materials, <br />labor, equipment, tools, and incidentals as required and no additional compensation will be <br />allowed therefore. <br />Bid Item No. 28 - Pedestrian Barricade <br />Payment for this item shall be at the contract unit price bid per Linear Foot as listed in the Bid <br />Proposal, and shall include full compensation for doing all work, including furnishing all materials, <br />labor, equipment, tools, and incidentals as required and no additional compensation will be <br />allowed therefore. <br />Bid Item No. 29 - Project Advertising Sign(s) <br />Payment for Project Advertising Sign shall be at the contract unit price bid per Each item listed <br />in the Bid Proposal, and shall include full compensation for doing all work, including furnishing <br />all materials, labor, equipment, tools, disposal of all removed materials, and incidentals as required <br />and no additional compensation will be allowed therefore. <br />Bid Item No. 30 - Construction Permit <br />The work under this item consists of obtaining a Construction Permit at the City of Santa Ana <br />Public Works Development Services counter and making the required deposit (refer to Section 2- <br />2a, Construction Permit, of these Special Provisions). <br />Payment for Construction Permits shall be at the contract unit price bid per Lump Sum listed in <br />the Bid Proposal, and shall include full compensation for doing all work and no additional <br />compensation will be allowed therefore. <br />
The URL can be used to link to this page
Your browser does not support the video tag.