My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
01/21/2025
>
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2025 4:50:22 PM
Creation date
1/21/2025 3:12:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
18
Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: 25-6030 <br />TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br />AVENUE <br />SECTION 3 - CONTROL OF THE WORK <br />3-5 INSPECTION <br />Add the following to this subsection: <br />City inspection occurs during construction working hours. Inspection work requested by the <br />contractor outside of the prescribed working hours shall be paid by the contractor at the City's <br />overtime rate. <br />3-7 CONTRACT DOCUMENTS <br />3-7.1 General <br />Add the following to this subsection: <br />The Contractor shall maintain a control set of plans and specifications within Procore at all times <br />throughout the construction period. As approved by the Engineer, all final locations determined <br />in the field and any deviations from the plans and specifications shall be marked in red on this <br />control set to show the As -Built conditions. Updates to the control set shall be submitted to the <br />Engineer prior to each monthly progress payment. Upon completion of all work, the Contractor <br />shall submit the control set As -Built Plans and report to the Engineer through Procore. <br />Additionally, the Contractor shall provide the following: <br />Street Improvements: Any deviations from the contract plans such as: alignments, and <br />appurtenance locations shall be noted (drawing sketch) on the control plan and a copy submitted <br />to the Engineer no later than (5) working days from the occurrence. <br />Storm Drain Improvements: Any deviations from the contract plans such as: alignments, <br />elevations, modifications to pipe/structures sizing/material. <br />Sewer Improvements: Any deviations from the contract plans such as: alignments, elevations, <br />modifications to pipe/structures sizing/material. Contractor shall also provide CCTV inspection <br />recordings/videos in format required by Engineer. <br />Water Improvements: Any deviations from the contract plans such as: alignments and <br />appurtenance locations shall be noted (drawing sketch) on the control plan and a copy submitted <br />to the Engineer no later than (5) working days from the occurrence. <br />Traffic Improvements: Any deviations from the contract plans such as: location of poles, pull <br />boxes and runs, depth of conduits, number of conductors, and other appurtenant work, for future <br />reference. <br />Within (15) days of completion of all work, the Contractor shall submit the control set of as -built <br />plans to the Engineer. Final payment will not be made until this requirement is met. <br />3-8 SUBMITTALS <br />Add the following to this subsection: <br />All submittals shall be delivered through Procore. <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.