My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
01/21/2025
>
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2025 4:50:22 PM
Creation date
1/21/2025 3:12:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
18
Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: 25-6030 <br />TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br />AVENUE <br />3-10 SURVEYING <br />3-10.1 General <br />The following supersedes the provisions of this subsection: <br />The Contractor shall be responsible for directly obtaining the services of a California Licensed <br />Land Surveyor to be in responsible charge of all survey work performed under this contract. <br />The Contractor shall be responsible for the scheduling of all survey requests. <br />The Contractor's Surveyor shall provide construction staking for project improvements. A copy <br />of the cut sheets shall be provided to the AGENCY for verification. Also a copy of all updated <br />control set by the Contractor's Surveyor; showing coordinates, elevation, and description shall be <br />submitted, for quality management (as -built checks by Agency). <br />The AGENCY will provide construction plans and specifications for the project. Construction <br />stakes shall be set per the provided plans and specifications. The Contractor's Surveyor shall notify <br />the AGENCY immediately of any discrepancy or design errors discovered on the plans during <br />staking or when verifying join points. <br />The Contractor's Surveyor shall research existing County and City records for centerline survey <br />monuments within the project area. Prior to construction, all monuments shall be tied -out and a <br />Corner Record shall be recorded with the County Surveyor per Section 8771 of the Business and <br />Professions Code of the State of California. After completion of construction, any monument <br />disturbed or lost during construction shall be reset, in conformance with Section 8771. Each <br />centerline intersection shall be drawn on a single Corner Record. A copy of all Corner Records <br />shall be submitted to the AGENCY prior to a Notice of Completion being filed. <br />The Contractor is responsible for maintaining a safe and orderly job site per Occupational Safety <br />and Health Administration (OSHA) standards. <br />The Contractor shall furnish traffic control as needed to provide a work area free of public and <br />construction traffic for construction staking. Traffic control shall conform to the requirements of <br />the "Watch Area Traffic Control Handbook" (WATCH). Payment for said work shall be included <br />in the other items of work and no additional compensation will be allowed. <br />3-11 CONTRACT INFORMATION SIGNS <br />Add the following to this subsection: <br />Contractor shall furnish, install and maintain a project advertisement sign as detailed in the Appendix <br />of the Contract Documents. The Contractor shall install the project advertisement sign during <br />construction in the location approved by the Engineer. The maintenance includes replacement (if <br />damaged due to the operations of the Contractor) and graffiti removal. <br />
The URL can be used to link to this page
Your browser does not support the video tag.