My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
01/21/2025
>
Item 18 - Traffic Signal Installation at Segerstrom Avenue and Rosewood Avenue
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2025 4:50:22 PM
Creation date
1/21/2025 3:12:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
18
Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: 25-6030 <br />TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br />AVENUE <br />these Special Provisions. Cracks shall be sealed per Section 1.11, Crack Repair and <br />Patching, of these Special Provisions. The pavement surface shall be cleaned with <br />a power broom to remove all loose material, silt, grass, and dirt. <br />The application of slurry shall be scheduled to commence after 8:00 a.m., and no <br />slurry operations shall be done after 2:00 p.m. unless otherwise approved by the <br />Engineer. Slurry shall be sufficiently cured for vehicle traffic without tracking or <br />damage to the surface by 3:00 p.m. on the same day. In case of damage done by <br />vehicles and/or pedestrians upon slurry that has not been sufficiently, the <br />Contractor shall replace all of the damaged work at the Contractor's expense and <br />no additional compensation shall be made by the AGENCY. Final striping shall be <br />installed per Section 2.02, Striping (Traffic Stripes and Pavement Markings), of <br />these Special Provisions. <br />Section 302-4.9 entitled "Field Sampling and Testing" of the Standard Specifications shall <br />be modified to add the following: <br />Upon the Engineer's direction, the Contractor shall slurry seal test sections within <br />the construction limits for each batch of slurry mix. No slurry shall be applied until <br />the test slurry sections have been approved by the Engineer. The costs of these <br />slurry tests shall be included in the unit price for slurry seal surfacing and no <br />additional compensation will be allowed therefore. <br />Section 302-4.10 entitled "Measurement" of the Standard Specifications shall be modified <br />to add the following: <br />Licensed weighmaster's certificates showing gross, tare, and net weight of each <br />truck load of slurry mix shall be submitted to the Engineer by the Contractor for <br />each working day of slurry operation. <br />1.08 ASPHALT CONCRETE <br />Asphalt concrete construction shall conform to Section 200, 203, 302 and 400 of the <br />Standard Specifications, Section 92 of the Caltrans Standard Specifications and these <br />Special Provisions. <br />Coarse aggregate shall consist of material which at least 75% by weight shall be crushed <br />particles in lieu of the requirements of Section 400-4.2.3. <br />Tack coat is required and the cost thereof shall be included in the price paid per ton for <br />asphalt concrete. <br />The required asphalt concrete mix designs shall be as follows: <br />Base Course PG 64-10, B3 <br />Leveling Course/Surface Course PG 64-10, C3 <br />Crack Filler PG 64-10, F <br />31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.