My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (6)
Clerk
>
Contracts / Agreements
>
S
>
SANTA ANA UNIFIED SCHOOL DISTRICT (8)
>
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 3:19:02 PM
Creation date
2/4/2025 2:49:42 PM
Metadata
Fields
Template:
Contracts
Company Name
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD)
Contract #
A-2025-001
Agency
Public Works
Council Approval Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> SPECIFICATIONS <br /> PROJECT NO.: 25-6030 <br /> TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br /> AVENUE <br /> Testing of the thermoplastic application rate, as described above, will be required <br /> following any adjustment to the thermoplastic application rate, thermoplastic <br /> applicator nozzles, or any other thermoplastic application equipment prior to <br /> commencement or re-commencement of striping. The initial testing and re-testing <br /> of thermoplastic application rates at any location shall be considered as a single <br /> thermoplastic application rate test for the approved test location. Contractor shall <br /> provide a sample striping test for City approval prior to permanent striping. <br /> Street sweeping of the areas to be re-striped will not be required, but obvious <br /> accumulations of loose material or debris shall be removed prior to application of paint <br /> or thermoplastic. <br /> Thermoplastic material shall be applied to the pavement at a temperature between 400° <br /> F. and 425°F.,unless the manufacturer recommends a different temperature. <br /> Section 84-2.04, "Payment," of the Caltrans Standard Specifications shall be deleted. <br /> F. RAISED PAVEMENT MARKERS <br /> Raised pavement markers shall conform to Section 85, "Pavement Markers," of the <br /> Caltrans Standard Specifications and these Special Provisions. Reflective pavement <br /> markers shall have abrasion-resistant surfaces. <br /> 1. Removal - The contractor shall remove any existing raised pavement markers that <br /> do not conform to the channelization plans, and repair any damaged pavement due <br /> to raised pavement marker removal to maintain a smooth and uniform surface per <br /> SSPWC Section 302-5.6.2. Any missing or broken raised pavement markers shall <br /> be replaced, in kind, within the project boundaries. <br /> 2. Installation - Install raised pavement markers per the channelization plans in <br /> accordance with Section 85-1.06, "Placement," of the Caltrans Standard <br /> Specifications and City of Santa Ana Standard Plans Nos. 1125A- 1125C. <br /> Section 85-1.04, "Payment," of the Caltrans Standard Specifications shall be deleted. <br /> 2.03 SIGNS (ROADSIDE SIGNS)AND MARKERS <br /> This section shall conform to Section 56-2, "Furnish Signs Panels," of the Caltrans <br /> Standard Specifications and these Special Provisions. <br /> A. GENERAL <br /> All new signs shall be furnished and installed by the Contractor. The sign sizes, <br /> messages, and colors shall conform to the current edition of the Caltrans Sign <br /> Specifications. The sign sizes shall be the standard size shown in the Uniform Sign <br /> Chart unless shown otherwise on the plans.The sign backing material shall be anodized <br /> rolled sheet aluminum and shall be one piece with drilled holes for mounting. <br /> 45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.