My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (6)
Clerk
>
Contracts / Agreements
>
S
>
SANTA ANA UNIFIED SCHOOL DISTRICT (8)
>
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 3:19:02 PM
Creation date
2/4/2025 2:49:42 PM
Metadata
Fields
Template:
Contracts
Company Name
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD)
Contract #
A-2025-001
Agency
Public Works
Council Approval Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> SPECIFICATIONS <br /> PROJECT NO.: 25-6030 <br /> TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br /> AVENUE <br /> 4.00 SPECIAL PROVISIONS -TRAFFIC SIGNAL SYSTEMS <br /> 4.01 DESCRIPTION <br /> This work consists of traffic signal installation or modifications and any other related work <br /> required to provide the intended operation at the locations shown on the project plans. <br /> This work shall be in accordance with the Plans, these Special Provisions, the Standard <br /> Specifications for Public Works Construction (SSPWC), Section 86 and 87 of the 2023 <br /> Caltrans Standard Specifications, the 2023 Caltrans Standard Plans, and any applicable <br /> errata(or Revised Standard Plans). <br /> The Caltrans Standard Specifications Section 86 and 87 set forth above will control the <br /> construction materials, and construction methods for specific work relating to Street <br /> Lighting, Traffic Signal Materials and Traffic Signal Systems, except as amended by the <br /> Project Plans and these Special Provisions. <br /> 4.02 NEC CERTIFICATE REQUIREMENT NOTICE <br /> Certification is required for all persons who perform work as electricians for contractors <br /> licensed as Class C-10 electrical contractors under the Contractor's State License Board <br /> Rules and Regulations. <br /> 4.03 FURNISHING AND INSTALLING <br /> Unless specifically called out by the plans or special provisions that a piece of equipment <br /> or material will be supplied by a third party, it is the Contractor responsibility to furnish <br /> and install all necessary equipment and material, even if not identified on the plan or in <br /> these special provisions, to provide the intended operation as shown on the plans. <br /> 4.04 SCHEDULING OF WORK <br /> The City of Santa Ana requires that the Contractor shall pothole all pole locations to <br /> determine the proper pole type and mast arm length prior to ordering. Contractor shall be <br /> responsible for the survey required to determine the pole locations. <br /> The City of Santa Ana will issue the notice to proceed to pothole following preconstruction <br /> meeting. All potholing is to be completed within 10 days following the issuance of the <br /> notice to proceed. Work shall be suspended following the completion of the potholing. <br /> The contractor may order traffic signal equipment following the contract award including <br /> poles. However,the City is not responsible for any pole changes due to unforeseen utilities <br /> conflict resulting from ordering of equipment prior to potholing. <br /> It is the intent of the City of Santa Ana that the Contractor be allowed to start construction <br /> activity at a reasonable length of time prior to delivery of equipment and following receipt <br /> of written notice to proceed. This will permit excavations, installation of conduits, pull <br /> 52 <br />
The URL can be used to link to this page
Your browser does not support the video tag.