CITY OF SANTA ANA <br /> SPECIFICATIONS <br /> PROJECT NO.: 25-6030 <br /> TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br /> AVENUE <br /> boxes and foundations in a most expedient manner, and minimize the disruption and <br /> inconvenience of an extended construction schedule. Construction, once started, shall be <br /> pursued until completion. <br /> Above ground signal work shall not commence until such time that the Contractor notifies <br /> the Engineer, in writing, of the date that all electrical materials and equipment controller <br /> assemblies, are received; and said work shall start within fifteen(15)days after said date. <br /> No materials or equipment shall be stored at the job site (outside of the public right-of- <br /> way) until the City issues a Notice to Proceed. The job sites shall be maintained in a neat <br /> and orderly condition at all times. No materials or equipment shall be stored within the <br /> public right-of-way. <br /> Unless noted otherwise, at least 5 working days of advanced notice shall be given(on any <br /> working day except Friday or the day preceding a legal holiday) to the Inspector for any <br /> installations of or modifications to channelization, signing, traffic signal and lighting <br /> systems.If sufficient notice is not given,the City shall not be liable for any resulting delays. <br /> 4.05 SUBMITTAL OF EQUIPMENT LIST AND DRAWINGS <br /> The contractor shall submit the followings for approval prior to the start of construction <br /> or some cases,before manufacturing: <br /> 1. Certificate (or letter from manufacturer) of Compliance to Caltrans specifications <br /> for traffic signal poles and equipment. <br /> 2. Certificate(or letter from manufacturer)of Compliance to Caltrans specifications <br /> for LED units. <br /> 3. Layout of each Reflectorized Street Name Sign. <br /> Certificate of Compliance is not required for equipment specifically called for by <br /> manufacture name and model. <br /> For new traffic signal installation, the Contractor shall supply 3 bond copies (24"x36") of <br /> the controller cabinet schematic wiring diagrams. <br /> For simple traffic signal modification, the contractor will make necessary revisions to the <br /> existing traffic cabinet print and supply the City 3 bond copies (24"x36") of the revised <br /> traffic cabinet print. <br /> For major traffic signal modification where revision to the existing cabinet print is not <br /> feasible,the contractor shall prepare and supply new cabinet prints as required. <br /> Materials lists, manufacturer's data, equipment brochures and operations manuals, <br /> technical data, controller cabinet wiring diagram, and all other related equipment <br /> information, shall be labeled and identified, and shall be submitted in bound booklet form. <br /> 53 <br />