My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (6)
Clerk
>
Contracts / Agreements
>
S
>
SANTA ANA UNIFIED SCHOOL DISTRICT (8)
>
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 3:19:02 PM
Creation date
2/4/2025 2:49:42 PM
Metadata
Fields
Template:
Contracts
Company Name
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD)
Contract #
A-2025-001
Agency
Public Works
Council Approval Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> SPECIFICATIONS <br /> PROJECT NO.: 25-6030 <br /> TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br /> AVENUE <br /> shall begin at a manhole adjacent to the most likely point of interference and <br /> unless blocked by an impassable obstruction, shall end at the closest upstream <br /> or downstream manhole or cleanout structure. Under no circumstances shall <br /> the contractor deliver to the City a video of a survey that was otherwise <br /> abandoned. If the camera cannot pass the entire sewer reach from its point of <br /> insertion,the reach shall be inspected from both directions. The consultant shall <br /> notify the City immediately of any such obstruction so that it may be repaired <br /> or mitigated by the City and/or the contractor and complete inspection of the <br /> pipe may proceed. <br /> Television inspection of sewer mains with high volumes of flow (pipe running <br /> 1/3 full or more)may, with prior consent of the City,be done at night between <br /> the hours of 10 p.m. and 5 a.m. No added compensation shall be allowed for <br /> night work. Notwithstanding, the consultant shall always use whatever <br /> mechanical means are available,including modification or changing of the <br /> camera wheels or treads,to insure that the image is recorded in an upright, <br /> un-rotated position. The City reserves the right to reject any videotape where <br /> changes in the orientation of the camera could have been corrected by such <br /> modifications or by performing the work during periods of low flow. <br /> CCTV inspections shall be delivered in an electronic format(CD/DVD) to the <br /> Engineer for review and approval. <br /> Cost for video inspection if required, shall be considered as included in other <br /> bid items. <br /> 4.16 PULL BOXES <br /> Pull boxes shall conform to the provisions in Section 86-1.02C,"Pull Boxes," and Section <br /> 87-1.03C, "Installation of Pull Boxes," of the Caltrans Standard Specifications, Caltrans <br /> Standard Plan ES-8, and these Special Provisions. <br /> Pull boxes'size shall be Number 6 except where shown otherwise on the plan or as directed <br /> by the Traffic Engineer. Bottoms shall be bedded in crushed rock. Pull boxes shall not be <br /> grouted. Pull boxes shall be polymer concrete reinforced with heavy-weave fiberglass and <br /> plastic lining. Pull box covers shall be lightweight (Christy Fibrelyte, or approved equal) <br /> with bolt down kit. <br /> Pull boxes adjacent to Traffic Signal poles shall have 10 foot ground rod with ground clamp <br /> and shall be fastened to bare grounding conductor from Traffic Signal pole. <br /> New pull boxes shall not be installed within any curb access ramp. No new pull box shall <br /> be located within five feet of a water meter or fire hydrant. <br /> Replace sidewalk in-kind to match existing material, color, and pattern, from score mark <br /> to score mark after pull boxes have been installed. <br /> 66 <br />
The URL can be used to link to this page
Your browser does not support the video tag.