My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (6)
Clerk
>
Contracts / Agreements
>
S
>
SANTA ANA UNIFIED SCHOOL DISTRICT (8)
>
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD) (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 3:19:02 PM
Creation date
2/4/2025 2:49:42 PM
Metadata
Fields
Template:
Contracts
Company Name
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD)
Contract #
A-2025-001
Agency
Public Works
Council Approval Date
1/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> SPECIFICATIONS <br /> PROJECT NO.: 25-6030 <br /> TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND ROSEWOOD <br /> AVENUE <br /> The Contractor shall perform leakage and pressure tests of the bypass pumping discharge <br /> piping suing clean water prior to the actual operation. The Water Resources Division shall <br /> be given 24 hours notice prior to testing. <br /> The Contractor shall be required to flow monitor for a two week period to assist in sizing <br /> the pumps necessary for the sewer work and shall be considered included as part of the <br /> work. The Contractor shall prepare, with the vendor, a flow monitoring map for key <br /> manholes that will provide adequate data for the work subject to review and approval from <br /> the Water Resources Division. Flow monitoring shall capture accurate instantaneous <br /> depth,velocity and flow data in 15-minute increments or less,or as otherwise approved by <br /> the Water Resources Division. The Contractor shall prepare with the vendor a specific, <br /> detailed description of the proposed pumping system and submit it and the vendor's <br /> references to the City. The Contractor shall submit to the City detailed descriptions <br /> outlining all provisions and precautions to be taken by the Contractor regarding handling <br /> of existing sewage flows. The submittal must be specific and complete, including such <br /> items as schedules, capacities of equipment, materials, and all other incidental protection <br /> of the access and bypass pumping locations from damage due to the discharge flows. <br /> The submittal shall include but not be limited to the following: <br /> 1. Sewer plugging method and types of plug. <br /> 2. Number, size,material, location and method of installation of suction piping. <br /> 3. Number, size, material, location and method of installation of discharge piping. <br /> 4. Bypass pump sizes, capacity, number of each size to be on-site and power <br /> requirements. <br /> 5. Calculations of static lift, friction losses, and flow velocity(pump curves showing <br /> pump operating range shall be submitted). <br /> 6. Standby power generator size. <br /> 7. Method of protecting discharge manholes or structures from erosion and damage. <br /> 8. Thrust block sizes and restraining lengths of pipes and locations (if necessary). <br /> 9. Method of noise control for each pump and/or generator. <br /> 10. Any temporary pipe supports and anchoring requirements. <br /> 11. Design plans and computations for access to bypass pumping locations indicated <br /> on the drawings. <br /> 12. Calculations for selection of bypass pumping pipe size. <br /> 96 <br />
The URL can be used to link to this page
Your browser does not support the video tag.